PLAN CHECK NO:
101106775
PROJECT ADDRESS:
4610 1/2 W Morningside Ave
PLAN CHECK ENGINEER:
Lee, WayneTEL:714
647-5848
EMAIL:
wlee@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
R-3
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
5/25/2021
INITIAL REVIEW
6/23/2021
EXPIRATION
11/21/2021
RECHECKS:
1.10/18/2021
PROJECT APPLICANT CONTACT PERSON:
2.01/14/2022
Conner Bauman
3.
TEL:
(714)330-3837
FAX:
VALUATION: $52,100.00
EMAIL:
Conner.bauman@gmail.com
FLOOD ZONE: A-0602320143J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2019 California Residential Code (CRC); 2019 California Building Code (CBC); CMC = 2019 California Mechanical Code; CPC = 2019 California Plumbing Code; CEC = 2019 California Electrical Code; T = Table; ICC = International Code Council.
(Information) The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
-Planning Division approval on the corrected/final set of drawings (647-5804). Previously
approved plans should be submitted to expedite the process.
-Police Department approval on the corrected/final set of drawings (647-5840).
-Public Works Agency approval (647-5039).
- Proof of Worker's Compensation Insurance shall be required at the time of permit issuance.
- School District Compliance Certificate; and a copy of the building permit application, signed by
the plan check engineer, shall be required by the School District to verify the scope of the work.
PLAN CHECK COMMENTS:
Submittal document is incomplete. Please submit following documentation. (2) copies are required:
Soils reports.
Elevation Certificate for new ADU.END OF COMMENTS