PLAN CHECK NO:
101109021
PROJECT ADDRESS:
2601 S Daimler St
PLAN CHECK ENGINEER:
Ahangian, KathyTEL:714
647-5812
EMAIL:
Kahangian@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
III B
OCCUPANCY CLASSIFICATION(S):
B, S-1
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
1/4/2022
INITIAL REVIEW
1/17/2022
EXPIRATION
7/3/2022
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
George Hanna
3.
TEL:
(714)633-8200
FAX:
(714)633-0269
VALUATION: $100000
EMAIL:
george@hannaconstruction.net
FLOOD ZONE: X-0602320278J
APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.Please return marked up set of drawings with corrections.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Fire Department approval on the corrected/final sets of drawings ((714)573-6100)
- Police Department approval on the corrected/final set of drawings (647-5840)
- Public Works Agency approval (647-5039)
- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceSubmit a signed copy of the contract showing labor and materials for all work to be done under the subject building permit application. The plan check engineer may accept the contract price as the valuation of improvements for unique/unusual projects in lieu of using a cost per square foot basis.Provide the following:- Provide a fully dimensioned site plan on each set of plans.
- Disabled access compliance must be shown on the site plan.( provide curb ramp detail)Show on the plans:
- Type of Construction (VB _SPK)Occupancies storing, handling, using, and/or selling hazardous materials, liquids, and chemicals shall submit a list of all said materials, listing their quantities and how they relate to specific California Building Code Table items. Note on the Floor Plan, type and quantity of hazardous material in each control area and fire-resistive rating for fire barriers. ( Type of materials and chemical)Provide complying exiting plan for the area. EXIT ACCESS. That portion of a means of egress system that leads from any occupied portion of a building or structure to an exit. CBC Sections 1016.Egress shall not pass through kitchens, storage rooms, closets or spaces used for similar purposes.An exit access shall not pass through a room that can be locked to prevent egress.( Through locker room)Table 1017.2 Exit Access Travel Distance:
OCCUPANCYWITHOUT SPRINKLERWITH SPRINKLERSYSTEM (feet)SYSTEM (feet)
A, E, F-1, I-1, M, R, S-1200250b
B200300c
F-2, S-2, U300400cCBC Section 1022.2.2 Exterior exit doors shall lead directly to the exit discharge or the public way.CBC Section 1028.5 Access to a public way. The exit discharge shall provide a direct and unobstructed access to a public way.Note on drawing: “Exit doors shall be openable from the inside without the use of a key or any special knowledge or effort.”The width of the level area on the side to which the door swings shall extend 24” past the strike edge of the door for exterior doors and 18” past the edge for storage door , and provide 12” clearance on the push side.The floor or landing at each side of an exit door shall be level and having a length in the direction of the door swing of at least 60” and the length opposite the direction of door swing of 48 as measured at right angles to the plane of the door in the closed position. CBC Section 11B-404.2.4.4 ( For storage room ‘s door)Provide minimum 48 “ clearance between doors in series in locker room. Provide 36”x48” clearance at the front of the urinal if the privacy wall is more than 24” long. Show card reader complies with accessibility.Exit illumination and exit sign requirements in accordance with CBC Section 1013shall be shown on the drawings. Be specific as to the type of exit signs to be installed.CBC Section 1013.1. Provide a directional exit sign at changes in exiting direction.Tactile exit signs shall be required at the following locations:
- Each grade-level exterior exit door shall be identified by a tactile exit with the word “EXIT.”
- Each exit door that leads directly to a grade-level exterior exit by means of a stairway or ramp shall be
identified by a tactile exit sign with the following words as appropriate:
- Each exit door that leads directly to a grade-level exterior exit by means of an exit enclosure, or an exit
passageway, shall be identified by a tactile exit sign with the words “EXIT ROUTE.”
- Each exit access door from an interior room or area to a corridor or hallway, which is required to have a visual
exit sign, shall be identified by a tactile exit sign with the words “EXIT ROUTE.”
- Each exit door through a horizontal exit shall be identified by a sign with the words “TO EXIT.”It is the project designer’s/property owner’s responsibility to show compliance on the drawings with all applicable Federal and State Accessibility Standards.Drawings submitted to the Building Division for review shall provide the following information to insure compliance with CBC Section 11B-202.4:
- An accessible entrance
- An accessible route to the altered area( Provide detail if there is any curbramp)
- Accessible restrooms
- Accessible telephone (if any)
- Accessible drinking fountains, and
- Parking, signage and alarmsComplete the attached Disabled Accessibility Documentation Form.CBC Section 11B-803, Locker room:
- The bottom of mirrors provided for use by persons with disabilities shall not be greater than 20” from the floor.
Mirrors to be used by persons with disabilities shall be full-length, measuring at least 18” wide by 54” high, and
shall be mounted in a position affording a view to a person on the bench as well as to a person in a standing
position.
- Clothing hooks shall be located notgreater than 8” from the floor.
- Every accessible dressing room shall have a 24” by 48” bench fixed to the wall along the longer dimension.
The bench shall be mounted 17 to 19” above the finish floor. Clear floor space shall be provided alongside the
bench to allow a person using a wheelchair to make a parallel transfer onto the bench. The structural strength
of the bench and attachments shall comply with Section 11B-610 The minimum clear space within the room
shall be 60” width and length. No door shall encroach into the required space.Show 5% of lockers comply with accessibility-This building is subject to the State of California Energy Conservation Regulations:
- The permit applicant shall be responsible for obtaining an energy plan check from a consultant who is
qualified to perform an energy efficiency analysis in accordance with the California Code of Regulations
(CCR,) Title 24, Par 6, 2016 California Energy Code. The plan check consultant must sign documentation
certifying that a thorough, competent review has been performed on behalf of the Enforcement Agency.
- The corrected/final ARCHITECTURAL drawings shall have the required energy efficiency compliance
documentation with completed signature blocks filed on the plans. The same information may be copied on
the Electrical Plans for the Electrical Plan Checker.
- Provide cool roofing as required by 2008 Energy Standards.
- The energy plan check consultant must complete the attached “Energy Conservation Plan Check Consultant
Qualification Statement.”
- Refer to the attached information sheet.Provide height of full height partition walls, for walls over 14’ high provide calculations.Provide span table for metal studs and ceiling joists, with ICC report. Show how new roll up door ( door#3) is supported. (Calculation might be needed)