HomeMy WebLinkAbout281943_2_Corrections.docxRESIDENTIAL PLAN CHECK
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101108757
PROJECT ADDRESS:
1008 E Fourth St
PLAN CHECK ENGINEER:
Le, TungTEL:714
647-5896
EMAIL:
Tle10@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
U
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
12/2/2021
INITIAL REVIEW
12/14/2021
EXPIRATION
5/31/2022
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Frank Chen
3.
TEL:
(626)203-1456
FAX:
VALUATION: $124,000.00
EMAIL:
fchen@kbhome.com
FLOOD ZONE: X-0602320276J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2019 California Residential Code (CRC); 2019 California Building Code (CBC); CMC = 2019 California Mechanical Code; CPC = 2019 California Plumbing Code; CEC = 2019 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.
The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
-Planning Division approval on the corrected/final set of drawings (647-5804). Previously
approved plans should be submitted to expedite the process.
-Police Department approval on the corrected/final set of drawings (647-5840).
On the plan, please clearly show location of the light standard poles (12-ft and 16-ft tall) per lighting legend SA and SB. For clarity, please show SA and SB at each light poles.
Provide structural calculation and details for light pole footing and anchor.
Electrical permit and plan review are required for the proposed exterior lightings. Please contact City permit service for permit applicant.