Loading...
HomeMy WebLinkAbout283110_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101109102 PROJECT ADDRESS: 1010 N Tustin Ave Bldg# B PLAN CHECK ENGINEER: Huang, GaryTEL:714 647-5862 EMAIL: Ghuang@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: N/A OCCUPANCY CLASSIFICATION(S): U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 1/12/2022 INITIAL REVIEW 1/13/2022 EXPIRATION 7/11/2022 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Mike Molinaro 3. TEL: (714)612-0971 FAX: VALUATION: $25,000.00 EMAIL: mikemolinaro@aol.com FLOOD ZONE: X-0602320164J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5862 for an appointment.Please return marked up set of drawings with corrections.Drawings submitted to the Building Division for review shall provide the following information to insure compliance with CBC Section 11B-202.4: - An accessible entrance - An accessible route to the altered area - Accessible restrooms - Accessible telephone (if any) - Accessible drinking fountains, and - Parking, signage and alarmsComplete the attached Disabled Accessibility Documentation Form.Red marked comment set is available to pick-up at the City Hall. ☒Additional Review Comment: Sheet F-1, special inspection: A) Please specify types of special inspection for concreteb) add/list special inspection requirement per soil report Sheet F-1, provide written letter per soil report that all repair plans are confirm with the Geotechnical Engineer’s recommendation. Sheet F-3, pipe pile and releveling note: specify relative density requirement for slurry per soil report.