Loading...
HomeMy WebLinkAbout283246_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101109147 PROJECT ADDRESS: 3701 W Moore Ave PLAN CHECK ENGINEER: Lee, WayneTEL:714 647-5848 EMAIL: wlee@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: III B, SPK OCCUPANCY CLASSIFICATION(S): B, F-1, S-1 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 1/18/2022 INITIAL REVIEW 2/10/2022 EXPIRATION 7/17/2022 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Paula Harris 3. TEL: (562)216-5244 FAX: VALUATION: $50,000.00 EMAIL: pharris@kkaia.com FLOOD ZONE: X-0602320258J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTSThe applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings ((714)573-6100) - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039)Plan check comments:**There is no red lines on the drawings and structural calculation.Sheet C.S. Provide a statement of the scope of work on plan related to this revision. Please keep the original approved scope of work on plan and add additional scope of work below it for this revision and with revision delta number.Sheet D-1.1.1. Minimum one layer of 5/8” thickness type “X” gypsum board is required on both side of the fire assembly wall. Revise detail 7 for P6 wall.Sheet A-2.1. Provide dimensions to specify the corridor width, located between warehouse and flower rooms. (e.g. between room C104 and C113)Sheet A-2.1. Relocate the 3’x3’ concrete pit (e.g. #14 note) not within the required egress corridor and on the accessible routes. (1020.3, 11B-403)All IP sheets. Please update the floor plan layout to match the latest architectural plan. (e.g. new hallways between warehouse C104 and flower rooms, new dry room…)All IP sheets. Specify thickness of the wall panel on plan.All IP sheets. Specify thickness of the ceiling panels on plan.Sheet IP-1.1. Design and detail the header of the door, supporting insulated ceiling. (e.g. door #05). However, I have not found header detail on sheet 1P-5.END OF COMMENTS