HomeMy WebLinkAbout283246_1_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101109147
PROJECT ADDRESS:
3701 W Moore Ave
PLAN CHECK ENGINEER:
Lee, WayneTEL:714
647-5848
EMAIL:
wlee@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
III B, SPK
OCCUPANCY CLASSIFICATION(S):
B, F-1, S-1
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
1/18/2022
INITIAL REVIEW
2/10/2022
EXPIRATION
7/17/2022
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Paula Harris
3.
TEL:
(562)216-5244
FAX:
VALUATION: $50,000.00
EMAIL:
pharris@kkaia.com
FLOOD ZONE: X-0602320258J
APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTSThe applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Fire Department approval on the corrected/final sets of drawings ((714)573-6100)
- Police Department approval on the corrected/final set of drawings (647-5840)
- Public Works Agency approval (647-5039)Plan check comments:**There is no red lines on the drawings and structural calculation.Sheet C.S. Provide a statement of the scope of work on plan related to this revision. Please keep the original approved scope of work on plan and add additional scope of work below it for this revision and with revision delta number.Sheet D-1.1.1. Minimum one layer of 5/8” thickness type “X” gypsum board is required on both side of the fire assembly wall. Revise detail 7 for P6 wall.Sheet A-2.1. Provide dimensions to specify the corridor width, located between warehouse and flower rooms. (e.g. between room C104 and C113)Sheet A-2.1. Relocate the 3’x3’ concrete pit (e.g. #14 note) not within the required egress corridor and on the accessible routes. (1020.3, 11B-403)All IP sheets. Please update the floor plan layout to match the latest architectural plan. (e.g. new hallways between warehouse C104 and flower rooms, new dry room…)All IP sheets. Specify thickness of the wall panel on plan.All IP sheets. Specify thickness of the ceiling panels on plan.Sheet IP-1.1. Design and detail the header of the door, supporting insulated ceiling. (e.g. door #05). However, I have not found header detail on sheet 1P-5.END OF COMMENTS