Loading...
HomeMy WebLinkAbout283397_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101109196 PROJECT ADDRESS: 601 E Dyer Rd PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): A-2 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 1/20/2022 INITIAL REVIEW 2/9/2022 EXPIRATION 7/19/2022 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Ken Youn 3. TEL: (213)820-9104 FAX: VALUATION: $10,000.00 EMAIL: info@uldla.net FLOOD ZONE: X-0602320278J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039) - County of Orange Health Department approval on the corrected/final set of drawings ((714)433-6000)Final plans shall be stamped, signed and dated by a licensed architect or a registered civil engineer. Sheet A-1.0: On the plan, please specify occupancy group (A-2). Sheet A-2.0: On the plan, please provide an accessible route from the public sidewalk to the building primary entrance. Provide details. (11B-202)Accessible parking on the right side of the ramp is noncompliance parking space. Please coordinate and revise plan accordingly. Single user restrooms: Please provide door symbol with as below for all-gender restroom. Detail 1/S-1: On the plan, please clearly specify/show 4x4 posts as “temporary shoring”. Detail 1/S-1: Please provide wall stud at 16” on center. Detail 1/S-1: Please provide detail to show connection/attachment of new wall stud to top plates to roof trusses. (End Comment)