Loading...
HomeMy WebLinkAbout283415_1_Corrections.docxSPC PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101109202 PROJECT ADDRESS: 2112 3/4 E Fourth St Unit# WCC01 PLAN CHECK ENGINEER: Huang, GaryTEL:714 647-5862 EMAIL: Ghuang@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 1/24/2022 INITIAL REVIEW 2/11/2022 EXPIRATION 7/23/2022 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Crystal Rodrigues-Maramba 3. TEL: (949)336-1550 FAX: VALUATION:$150,000.00 EMAIL: crodrigues@coastalbusinessgroup.net FLOOD ZONE:X-0602320277J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5862 for an appointment.Please return marked up set of drawings with correctionsThe applicant shall obtain clearances/approvals for the following, prior to building permit issuance:☒Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process.☐Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700). ☒Police Department approval on the corrected/final set of drawings (647-5840).☒Public Works Agency approval (647-5039).☐Proof of Worker's Compensation Insurance shall be required at the time of permit issuance.☐School District Approval; and a copy of the school fee worksheet, completed by the plan check engineer, shall be required by the School District to verify the scope of the work.☐Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039).Red marked comments set is available to pick-up at the City Hall☒Additional Review Comment: Sheet D03, detail 7: specify each panel operating weight on drawingSheet D03, detail 6: provide structural calculation for generator anchorage design, and Provide Hilti anchorage bolt layout/spacing on plan. Please note and coordinate, the generator specification on sheet D08 show 10 mounting holes (not 8 as specified on detail 6/D03)Sheet D03, detail 5: provide structural calculation for design of anchorage for the utility panelspecify on plan that all anchors expose to weather shall be stainless steelSheet D04, detail 2: provide structural calculation of the 8” block wall designSheet D06, detail 1: Specify WUC cabinet operating weightProvide structural calculation for the WUC cabinet anchorage design(End of Comment)