HomeMy WebLinkAbout283481_1_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 105109223 PROJECT ADDRESS: 315 W Walnut St PLAN CHECK ENGINEER: Huang, GaryTEL:714 647-5862 EMAIL: Ghuang@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 1/25/2022 INITIAL REVIEW 1/31/2022 EXPIRATION 7/24/2022 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Carlos Bustamonte 3. TEL: (714)640-1978 FAX: VALUATION: EMAIL: carlos@ucproperties.com FLOOD ZONE: X-0602320276J GUIDELINES: Comments contained within this report reflect only those of the Building and Safety Division. Additional comments or corrective action may be required by other Departments and/or outside Agencies This Plan Review Report and all subsequent code references are based upon the most recent version(s) of the 2019 California Building Codes (CBC, CRC, CFC, CEC, CPC, CMC, CGBSC, and CEES) The approval of plans and any supporting documents does not permit the violation of any section of the adopted building codes or other pertinent local ordinances, or state and federal laws All listed plan review comments must be adequately addressed before a building permit can be issued Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used. Please see correction on submitted plans. Red marked set must be returned with revised plans. Plans resubmitted without the red markup set may result in delayed review time and additional plan check fees. Red marked comments set is available to pick-up at the City Hall PLAN REVIEW COMMENTS: Applicant shall address all the checked‘☒’ correction comments below before resubmitting plans to Building Safety for recheck. ☒1. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: ☒Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. ☐Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700). ☐Police Department approval on the corrected/final set of drawings (647-5840). ☐Public Works Agency approval (647-5039). ☐Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. ☐School District Approval; and a copy of the school fee worksheet, completed by the plan check engineer, shall be required by the School District to verify the scope of the work. ☐Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039). ☒2. Note on plan: All concealed work installed without permits must be exposed for inspection to the satisfaction of the Building Inspector. This includes methods of attachment and all footings, structural members, mechanical, electrical, plumbing and insulation. ☒3. Note on plan: Mechanical, electrical and plumbing are not part of this plan review and approval. MEP are subject to building field inspection. Structural Plan Review Comments: ☒1. Sheet S2.0: Please clarify if there are ceiling joist under the rafter tie, if so, please provide ceiling joist size and spacing ☒ 2. Sheet S2.0: Please provide calculation to justify 2x12 rafter tie is adequate at every 32” o.c. ☒3. Sheet S2.0: Please provide connection/detail for rafter tie to roof rafter ☒4. Sheet SD1, detail 2: please provide correct reference for notes #2, #3, #4, #6, and #7(End of Comment)