PLAN CHECK NO:
101108959
PROJECT ADDRESS:
2730 S Rene Dr
PLAN CHECK ENGINEER:
Huang, GaryTEL:714
647-5862
EMAIL:
Ghuang@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
R-3, U
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
12/20/2021
INITIAL REVIEW
12/21/2021
EXPIRATION
6/18/2022
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Jonathan Cardenas
3.
TEL:
(951)348-2095
FAX:
VALUATION: $12,706.00
EMAIL:
rose@kingsofcad.com
FLOOD ZONE: X-0602320259J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2019 California Residential Code (CRC); 2019 California Building Code (CBC); CMC = 2019 California Mechanical Code; CPC = 2019 California Plumbing Code; CEC = 2019 California Electrical Code; T = Table; ICC = International Code Council.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5862 for an appointment.The drawings/information submitted for Building Safety Division review is incomplete. The applicant shall, prior to resubmitting, complete all construction documents to show compliance with the 2019 California Building Standards Code with local amendments and to clearly indicate the scope of work under this building permit application. There may be additional requirements when complete construction drawings and supporting data is submitted for Building Safety Division review.
Please see corrections on submitted plans. Red marked set must be returned with revised plans. Plans resubmitted without the red markup set may result in delayed review time and additional plancheck fees.
All drawings and supporting documents shall be prepared, stamped, and signed by a California licensed architect or registered professional engineer. (CRC R301.1.3, CBC 107.1 and 107.3.4.1).All persons preparing plans for others shall sign those plans. Business and Professions Code Chapter 3, Division 3, Section 5536.1 (a).
The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
-Planning Division approval on the corrected/final set of drawings (647-5804). Previously
approved plans should be submitted to expedite the process.
Sheet P-01: Please update cover patio size to 13 x17 square feet
Note on plan: Mechanical, electrical and plumbing are not part of this plan review and approval. MEP are subject to building field inspection
Identify/select which Temo system is used (single beam, double beam, etc)
Provide structural drawing and indicate framing/foundation size (including footing reinforcing) per the selected Temo system
Provide structural calculation (including gravity and lateral analysis) for review based on the selected Temo system
Sheet Section “A”: provide patio slope
Sheet Section “A”: provide applicable detail (B4 is referenced to a different detail on Temo drawings 4 of 7)