Loading...
HomeMy WebLinkAbout280744_4_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101108370 PROJECT ADDRESS: 1700 E Carnegie Ave Unit# 100 PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: III B, SPK OCCUPANCY CLASSIFICATION(S): B, S-1 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 10/25/2021 INITIAL REVIEW 11/6/2021 EXPIRATION 4/23/2022 RECHECKS: 1.1/25/2022 PROJECT APPLICANT CONTACT PERSON: 2. Sahar Abbasnia 3. TEL: (949)788-40511051 FAX: VALUATION: $400,000.00 EMAIL: sabbasnia@waremalcomb.com FLOOD ZONE: X-0602320278J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS Required Approval and General Instruction All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039)Orange County Fire Authority (714) 573-6100Sheet I0.5: Exiting from the office area should not exit through the storage/shipping area. Please provide door between the shipping area and exit corridor. 2nd Review Comment: New double doors provided between the shipping area and corridor – Please revise plan to show/provide minimum 48” clear between doors in series. Material Stock room: Please show second exit (egress path) for the material stock room. 2nd Review Comment: Material stockroom – Please provide one exit open directly to the existing corridor. Sheet I2.1: 2nd Review Comment: Response was insufficient – the comment below remain applicable. Please coordinate with comment above to provide door between existing shipping room and exit corridor. Please provide/show door from the material stock room to the existing corridor. On the plan, please provide door schedule (door dimensions). Double-leaf doors – at least one of the active leaves of doorways shall provide a clear width of 32 inches minimum. (11B-404.2.2)Sheet A2.01: Where six or more toilet compartments are provided, or where the combination of urinals and water closets totals six or more fixtures, toilet compartments complying with Section 11B-604.8.2 shall be provided in the same quantity as the toilet compartments required to comply with Section 11B-604.8.12nd Review Comment: Men Restroom – Please provide at least one toilet compartment complying with 11B-604.8.2. (End of Comment)