HomeMy WebLinkAbout282810_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101109021 PROJECT ADDRESS: 2601 S Daimler St PLAN CHECK ENGINEER: Ahangian, KathyTEL:714 647-5812 EMAIL: Kahangian@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: III B OCCUPANCY CLASSIFICATION(S): B, S-1 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 1/4/2022 INITIAL REVIEW 1/17/2022 EXPIRATION 7/3/2022 RECHECKS: 1.2/12/22 PROJECT APPLICANT CONTACT PERSON: 2. George Hanna 3. TEL: (714)633-8200 FAX: (714)633-0269 VALUATION: $160000 EMAIL: george@hannaconstruction.net FLOOD ZONE: X-0602320278J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.Please return marked up set of drawings with corrections.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings ((714)573-6100) - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceSubmit a signed copy of the contract showing labor and materials for all work to be done under the subject building permit application. The plan check engineer may accept the contract price as the valuation of improvements for unique/unusual projects in lieu of using a cost per square foot basis.2/12/22Provide the following:2/12/22- Provide a fully dimensioned site plan on each set of plans. - Disabled access compliance must be shown on the site plan.( provide curb ramp detail)Provide detectible warning along the landing.Show on the plans: 2/12/22 - Type of Construction (VB _SPK)Occupancies storing, handling, using, and/or selling hazardous materials, liquids, and chemicals shall submit a list of all said materials, listing their quantities and how they relate to specific California Building Code Table items. Note on the Floor Plan, type and quantity of hazardous material in each control area and fire-resistive rating for fire barriers. ( Type of materials and chemical) 2/12/22Provide complying exiting plan for the area. Common path of travel exceeds allowable distance , see sheet A2.3 (not resolved) 2/12/22EXIT ACCESS. That portion of a means of egress system that leads from any occupied portion of a building or structure to an exit. CBC Sections 1016. (pending) 2/12/22Egress shall not pass through kitchens, storage rooms, closets or spaces used for similar purposes.(pending) goes through the changing room 2/12/22An exit access shall not pass through a room that can be locked to prevent egress.( Through locker room)(Pending) Doors cannot have lock 2/12/22Table 1017.2 Exit Access Travel Distance:2/12/22 OCCUPANCYWITHOUT SPRINKLERWITH SPRINKLERSYSTEM (feet)SYSTEM (feet) A, E, F-1, I-1, M, R, S-1200250b B200300c F-2, S-2, U300400cCBC Section 1022.2.2 Exterior exit doors shall lead directly to the exit discharge or the public way.2/12/22CBC Section 1028.5 Access to a public way. The exit discharge shall provide a direct and unobstructed access to a public way. 2/12/22Note on drawing: “Exit doors shall be openable from the inside without the use of a key or any special knowledge or effort.” 2/12/22The width of the level area on the side to which the door swings shall extend 24” past the strike edge of the door for exterior doors and 18” past the edge for storage door , and provide 12” clearance on the push side. (Pending) for utility room 2/12/22The floor or landing at each side of an exit door shall be level and having a length in the direction of the door swing of at least 60” and the length opposite the direction of door swing of 48 as measured at right angles to the plane of the door in the closed position. CBC Section 11B-404.2.4.4 ( For storage room ‘s door)(pending) For utility room and air lock room .2/12/22Provide minimum 48 “ clearance between doors in series in locker room. 2/12/22 Provide 36”x48” clearance at the front of the urinal if the privacy wall is more than 24” long. 2/12/22 Show card reader complies with accessibility. 2/12/22Exit illumination and exit sign requirements in accordance with CBC Section 1013shall be shown on the drawings. Be specific as to the type of exit signs to be installed. 2/12/22CBC Section 1013.1. Provide a directional exit sign at changes in exiting direction. 2/12/22Tactile exit signs shall be required at the following locations:(Pending) show the location on the floor plan 2/12/22 - Each grade-level exterior exit door shall be identified by a tactile exit with the word “EXIT.” - Each exit door that leads directly to a grade-level exterior exit by means of a stairway or ramp shall be identified by a tactile exit sign with the following words as appropriate: - Each exit door that leads directly to a grade-level exterior exit by means of an exit enclosure, or an exit passageway, shall be identified by a tactile exit sign with the words “EXIT ROUTE.” - Each exit access door from an interior room or area to a corridor or hallway, which is required to have a visual exit sign, shall be identified by a tactile exit sign with the words “EXIT ROUTE.” - Each exit door through a horizontal exit shall be identified by a sign with the words “TO EXIT.”It is the project designer’s/property owner’s responsibility to show compliance on the drawings with all applicable Federal and State Accessibility Standards. 2/12/22Drawings submitted to the Building Division for review shall provide the following information to insure compliance with CBC Section 11B-202.4: - An accessible entrancepending ( provide truncated dome) 2/12/22 - An accessible route to the altered area( Provide detail if there is any curb ramp) (Truncated dome for entire width of the landing) 2/12/22 - Accessible restrooms - Accessible telephone (if any) - Accessible drinking fountains, and - Parking, signage and alarmsComplete the attached Disabled Accessibility Documentation Form.Pending (Not included) 2/12/22CBC Section 11B-803, Locker room:(Pending) If there is no dressing room what is the use of hooks and bench 2/12/22 - The bottom of mirrors provided for use by persons with disabilities shall not be greater than 20” from the floor. Mirrors to be used by persons with disabilities shall be full-length, measuring at least 18” wide by 54” high, and shall be mounted in a position affording a view to a person on the bench as well as to a person in a standing position. - Clothing hooks shall be located notgreater than 48” from the floor. - Every accessible dressing room shall have a 24” by 48” bench fixed to the wall along the longer dimension. The bench shall be mounted 17 to 19” above the finish floor. Clear floor space shall be provided alongside the bench to allow a person using a wheelchair to make a parallel transfer onto the bench. The structural strength of the bench and attachments shall comply with Section 11B-610 The minimum clear space within the room shall be 60” width and length. No door shall encroach into the required space.Show 5% of lockers comply with accessibility-This building is subject to the State of California Energy Conservation Regulations: (Pending) Not found 2/12/22 - The permit applicant shall be responsible for obtaining an energy plan check from a consultant who is qualified to perform an energy efficiency analysis in accordance with the California Code of Regulations (CCR,) Title 24, Par 6, 2016 California Energy Code. The plan check consultant must sign documentation certifying that a thorough, competent review has been performed on behalf of the Enforcement Agency. - The corrected/final ARCHITECTURAL drawings shall have the required energy efficiency compliance documentation with completed signature blocks filed on the plans. The same information may be copied on the Electrical Plans for the Electrical Plan Checker. - - The energy plan check consultant must complete the attached “Energy Conservation Plan Check Consultant Qualification Statement.” - Refer to the attached information sheet.Provide height of full height partition walls, for walls over 14’ high provide calculations.(Pending) Not included, provide for 21’ high wall. 2/14/22Provide span table for metal studs and ceiling joists, with ICC report. (Pending) Not included 2/14/22 and calculations not provided. Show how new roll up door ( door#3) is supported. (Calculation might be needed) 2/14/22On the ceiling plan show type and thickness of gypsum board.