Loading...
HomeMy WebLinkAbout278988_3_Corrections.docx PLAN CHECK NO: 101107833 PROJECT ADDRESS: 1016 N Flower St PLAN CHECK ENGINEER: Lee, WayneTEL:714 647-5848 EMAIL: wlee@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3, U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 8/31/2021 INITIAL REVIEW 9/28/2021 EXPIRATION 2/27/2022 RECHECKS: 1.03/16/2022 PROJECT APPLICANT CONTACT PERSON: 2. Benito Corona 3. TEL: (714)371-7176 FAX: (914)339-8869 VALUATION: $40,000.00 EMAIL: bcndesigner@sbcglobal.net FLOOD ZONE: X-0602320144J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2019 California Residential Code (CRC); 2019 California Building Code (CBC); CMC = 2019 California Mechanical Code; CPC = 2019 California Plumbing Code; CEC = 2019 California Electrical Code; T = Table; ICC = International Code Council. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: -Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. -Public Works Agency approval (647-5039). PLAN CHECK COMMETNS Sheet T24-1. Add new 5’x6’8” glazed door into section I fenestration design in energy calculation. STRUCTURAL At the exterior wall of the kitchen with enlarged opening for the new glazed door, provide lateral force resisting system design along the exterior wall. Provide structural calculation and lateral shear transfer detail at the top and at the bottom of the shear wall. END OF COMMENTS