HomeMy WebLinkAbout284088_2_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101109402
PROJECT ADDRESS:
626 S Harbor Blvd
PLAN CHECK ENGINEER:
Ahangian, KathyTEL:714
647-5812
EMAIL:
Kahangian@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
B
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
2/9/2022
INITIAL REVIEW
2/12/2022
EXPIRATION
8/8/2022
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
David R Gamboa
3.
TEL:
(714)597-5560
FAX:
VALUATION: $53,100.00
EMAIL:
aes.dave67@gmail.com
FLOOD ZONE: X-0602320256J
APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.Please return marked up set of drawings with corrections.All persons preparing plans, specifications, and instruments of service for others shall sign those plans, specifications and other instruments of service for others shall sign those plans, specifications and other instruments of service and all contracts therefore. This requirement applies to both exempt and non-exempt projects. Business and Professions Code Chapter 3, Division 3, Section 5536.1(a).Include address and telephone number of the responsible designer, and date of signing of drawings.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Public Works Agency approval (647-5039)
- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceSubmit a signed copy of the contract showing labor and materials for all work to be done under the subject building permit application. The plan check engineer may accept the contract price as the valuation of improvements for unique/unusual projects in lieu of using a cost per square foot basis.Note on the plan, type of the business and describing the business.Please remove all unrelated details .Show on the plans:
- Occupancy Classification (M)Provide typical section view detail of all new partitions and ceilings showing:
- Method of attaching framing to the building structure. Compliance shall be shown with CBC Section 1607.13
for lateral support of the walls. Do not support top of walls to suspended ceiling system unless calculations
and drawing prepared by a registered engineer are submitted for review. Submit structural engineering
calculations for walls in rooms with a floor to building structure above height greater than 14’.
- Heights of partition, suspended ceiling, structure above.Provide on the drawings a complete door schedule, showing:
- Door sizes (CBC Sections 11B-404)
- Hardware complying with exiting and disabled accessibility requirements Provide specifications for doors hardware (i.e., lever type, push-pull panic, etc) to comply with disabled access requirements. Drawings submitted to the Building Division for review shall provide the following information to insure compliance with CBC Section 11B-202.4:
- An accessible entrance
- An accessible route to the altered area
- Accessible restrooms
- Accessible telephone (if any)
- Accessible drinking fountains, and
- Parking, signage and alarms Is there any check stand , if there is show compliance with accessibility.Plumbing facilities shall be provided in accordance with the California Plumbing Code (CPC) Section 412.0 and CPC Table 4-1.Separate, disabled accessible, sanitary facilities shall be provided for each gender in accordance with the California Plumbing Code (CPC) Section 412.3 and CBC Section 11B-603 and 11B-604.3.1 Show minimum 60” clearance from toilet wall to the sink.Complete the attached Disabled Accessibility Documentation Form.Provide on the drawings a complete window schedule showing:
- Window sizes
- Type and thickness of glazing (type of safety glazing) for new glass room.Provide complete engineering calculation and construction detail for free standing glass room , to show how laterally and vertically supported, if it is not part of this permit please remove it. Show how new walls are supported laterally. Provide specification and details for stone and masonry veneer, show how it is anchored. Anchored masonry veneer located in seismic zone D shall comply with CBC 1404.6Indicate Vertical support for anchor veneer and air spacing.Show exterior wall construction assembly. A minimum of one layer of No. 15 asphalt felt, free from holes and breaks, complying with ASTM D 226 for Type 1 felt shall be applied over studs of all exterior walls. Specify that two layers of Grade D or 60 minute Grade D paper shall be applied over all wood base sheathing. (CRC R703.2)