Loading...
HomeMy WebLinkAbout277861_6_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101107492 PROJECT ADDRESS: 3535 W Garry Ave PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B, SPK OCCUPANCY CLASSIFICATION(S): F-1, S-1, S-2 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 8/12/2021 INITIAL REVIEW 9/7/2021 EXPIRATION 2/8/2022 RECHECKS: 1.11/30/2021 PROJECT APPLICANT CONTACT PERSON: 2.1/3/2022 Brad Kenson 3.2/25/2022 TEL: (949)228-5687 FAX: VALUATION: $120,000.00 EMAIL: brad@fastrackpower.com FLOOD ZONE: X-0602320258J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings ((714)573-6100) - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039)4thReview Comment: Responses were incomplete. The following comments remain applicable and being modified based on the revised plans: Sheet TS: Project Scope – For clarity, please revise scope of work to include the mechanical attic platforms using for mechanical equipment only. 2nd Floor: Please revise plans to show/provide a corridor connection the circulation hallway to the second stairway. 2nd Floor: Please move door S closer to the bottom of the page go give enough separation from the door way D. Stairways: Please revise plans to provide 44” width stairway for both stairways. Coordinate and revise enlarged stairway plan and floor dimensions plans. Stairway 25/A7.3: Please revise detail to show/provide handrail extension horizontally of 12” in the direction of travel. (End Comment)