Loading...
HomeMy WebLinkAbout282355_3_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101108888 PROJECT ADDRESS: 1951 E Dyer Rd Unit# D PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B, SPK OCCUPANCY CLASSIFICATION(S): B, M PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 12/14/2021 INITIAL REVIEW 1/12/2022 EXPIRATION 6/12/2022 RECHECKS: 1.2/11/2022 PROJECT APPLICANT CONTACT PERSON: 2.3/23/2022 William Peters 3. TEL: (949)412-4428 FAX: VALUATION: $35,000.00 EMAIL: williamapeters@yahoo.com FLOOD ZONE: X-0602320278J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039)Sheet A-1: Restroom Water Closet: a 60” floor clear space is required for the water closet. Please remove wall between water closet and sink to provide 60” clear floor space. 2nd Review Comment: Referenced detail 1/A-2 – Please revise restroom floor plan to show 60” clear floor space for the water closet (measured from the side wall to the edge of the vanity). 3rd Review Comment: 1/A-2: the should be no projection within the water closet required clear space (11B-604.3.2). Please remove the 2” pop-out wall. On the plan, please provide construction detail for new wall. Details shall be clearly cross-reference onto the plan. 2nd Review Comment: Please provide the following information for the wall and ceiling construction Please provide ceiling framing plan and attachment details. 3rd Review Comment: Sheet S-1 – Response was incomplete. Please provide the following information: Provide detail connection at bottom (slab) – clearly specify fastener size and spacing. Show detail of ceiling joist to wall, specify fastener information. Show/provide detail of braces to top track and to structural floor above, include fastener information. ***PLAN WAS INCOMPLETE. PLAN REVIEW WILL CONTINUE AT TIME OF RESUBMITTAL ANDADDITIONAL COMMENT MAY BE REQUIRED***