Loading...
HomeMy WebLinkAbout276935_3_Corrections.docxPLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101107197-198 PROJECT ADDRESS: 2350 S Redhill Ave Bldg# B Parking Structure PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: I B, SPK OCCUPANCY CLASSIFICATION(S): A-3, S-2 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 8/3/2021 INITIAL REVIEW 8/27/2021 EXPIRATION 1/30/2022 RECHECKS: 1.2/22/2022 PROJECT APPLICANT CONTACT PERSON: 2. Heidi Hare 3. TEL: (949)246-0492 FAX: VALUATION: $20,597,076.00 EMAIL: heidi@jlhare.com FLOOD ZONE: X-0602320279J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS Non-StructuralReview by TungLeTle10@santa-ana.org (714)647-5896 General Instruction and Approval Required All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker. Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used. Resubmit 3corrected sets of plans. The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings ((714)573-6100) - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039) - Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039) - School District Compliance Certificate; a copy of the building permit application, signed by the plan check engineer, shall be required by the School District to verify the scope of work. Refer to the attached handout. Reminder: Parcel map shall be approved and recorded prior to building permit issuance. Sheet GA0.1.0: Sheet Index: Plumbing, Mechanical, and Electrical are on a separate review. Please omit the MEP sheets from the Sheet Index. 2ndReview Comment: MEP are under a separate submittal package and review. For clarity, please note on the Sheet Index “Under Separate Review” for the MEP. Please provide a mini set of plan for easy carry around for plan check purposes. Provided. Thank you. Please provide updated mini sets. Sheet GA1.1: On the plan, please show (setback) distance between buildings on the same lot, from property lines, and from centerline of streets or public alley. 2ndReview Comment: Could not locate Civil plans as mentioned. Please provide site plan showing fire separation distance. Egress Plans (Sheet GA1.2 through GA1.5) On the plans, please clearly show/identify the accessible means of egress elevators that complied with Section 1009.4. (1009.2.1) 2nd Review Comment: The elevators are serving accessible floor for four or more stories above the level of discharge, not less than one required accessible means of egress shall be an elevator complying with Section 1009.4. Roof Deck Amenity: Please clearly clarify on plan whether the roof deck assembly area would be opened to public or it’s limited to the residential tenants only. 2nd Review Comment:For clarity, please note on plan “roof deck amenities are not open to public use”. Second tier exit access: Two exits are required for the area on the left ramp parking area. The vehicle ramp leading up to third tier shall not be considered as an exit access. (1006.2.2.5; 406.4.3) 2nd Review Comment: Vehicle ramp shall not be considered as an exit access ramp. The exit access stairway shall be connected to a pedestrian facilities. General: Vehicular ramps using as for means of egress: The vehicle ramp may only use for exit for persons using the vehicle parking on that ramp. Please redesign parking so that a person is not required to travel through two (2) consecutive vehicular ramps before reaching the exit stairway. 2nd Review Comment: Please see code references on comment #3 above (1006.2.2.5; 406.4.3). Accessible Path of Travel Plans (Sheet GA1.6 through GA1.9) Slope ramps serving as part of vertical circulation shall be 5% maximum slope and 2% max cross-slope as part of the accessible means of egress. Please coordinate and revise plan accordingly. (1009) On the plan, please provide/show detectable warning between the pedestrian circulation path and vehicular area (parking), including the interior stairway at tier one.Truncated dome provided was incomplete. (11B-247.1) 2nd Review Comment: Response was incomplete. Detectable warning shall be provided between the pedestrian circulation and the vehicular areas, including adjacent to the parking spaces.The truncated dome should continue and terminated at a wall or a barrier. Floor Plans (Sheet GA2.1 through GA2.7) Elevators: Please show two-way communication in accordance with Section 1009.8. 2nd Review Comment:Response was insufficient. Section 1009.8, exception 2 could not be used since vehicle ramps is not considered an accessible means of egress system. Two-way communication is required in accordance with Section 1009.8. Enlarged Plan (Sheet GA6.11) Please clearly referenced to the specific details for the accessible restroom information in compliance with Chapter 11B, Division 6. 2nd Review Comment: For clarity, please show on plan how sheet GA6.16 was referenced for the accessible restroom information. Provide details for the accessible drinking fountains. 2nd Review Comment: Please show accessible drinking fountain elevations with spout location with required dimensions. Detailing Sheets Provide details to show transition between the residential building and parking garage with seismic separation required by structural design – at roof, floor, and door, and etc. Details shall be clearly cross- referenced onto the plan. 2nd Review Comment: For clarity, please provide details for reference. Provide fire blockings and smoke barriers in the concealed spaces between parking garage wall and residential wall. Details shall be clearly cross-referenced onto the plan. 2nd Review Comment: For clarity, please coordinate and provide details for reference. Sheet GA8.10: On the plan, please provide ICC or UL listing report number for the fire- rated spray material. Provide specification for review and approval. 2nd Review Comment: Response was insufficient. Please provide spray specification and listing for fire-rating requirement. Sheet GA6.12, Note #A6: Referenced to detail 14, 15/ GA8.4 were not applicable – please provide detail attachment of suspended ceiling. 2nd Review Comment: Please provide ceiling framing plans and details. Provide detail for hard-ceiling finish (ex. Over the restroom area). 2nd Review Comment: Please provide ceiling framing plans and details. STRUCTURAL REVIEW COMMENTS: Wayne Lee Wlee@santa-ana.org (714)647-5848THE FOLLOWING BUILDING PERMIT IS REQUIRED:Submit and obtain building permit (maybe under separate permit) for the design of the ground improvement mitigation method (listed by approved agencies. E.g. ICC) to mitigate the effects of liquefaction and for support of the proposed foundation system. Please note that this soils reinforcement design permit must be approved and issued no later than building permit issuance.PC 2nd comment: No record of submission as of February 24th, 2022.PC 3rd review comments: No record of submission. If submitted, provide building plan check number in your response.PLAN CHECK COMMENTSPC 3rd review comments: This is incomplete submission. Provide and clarify following:Sheet GS8.1 and GS8.2. For landscape structures are not within the scope of this permit, please remove those sheets from next submittal.Provide soils report with addendums.Provide a copy of ground improvement design and plans to for verifying foundation design.Based on the limited available information, only partially reviewed on this plan check. Comments not able to be reviewed is responded as “Pending”.Please refer to plan check set for plan check comments not shown in this list.Please provide address on the title block on each sheet. (Refer to architectural sheets for address)PC 2nd comment: Not resolved. Revise all sheets with correct address: 2350 S Redhill Ave, Santa Ana, CA. 92705.PC 3rd review comments: Revise all sheets with correct address: 2350 S Redhill Ave, Santa Ana, CA. 92705.Provide sheet index on sheet GS1.1.PC 2nd comment: index is not available on sheet GS1.1. In addition, the structural sheet index shown on architectural plan GA0.1.0 does not match the structural package.PC 3rd review comment: The structural sheet index shown on architectural plan GA0.1.0 does not match the structural plans. Please update. In addition, sheet GS8.1 and GS8.2 are not within the scope of this permit, please do not include them. (Deferred submittal item #5: overhead landscape structures).On sheet GS1.1, list all structural deferred submittal items on cover sheet. (e.g. stairway construction).Sheet GS2.8A. Please justify the column cap design and dimensions at the middle columns where two columns shared with one cap. (e.g. Grid F,5 and F,7.)Sheet GS2.8A. A column cap is shown between the concrete shear wall and PT slab in the pool. Please clarify the column location and if this detail is applicable. (e.g. Grid E,5.)Sheet GS2.8A. Please add a note on plan to specify the column cap dimensions located at the edge of the slab. E.g. Grid A, 5.7.Provide and cross-reference complete PT-slab design at the amenity level (e.g. calculation page 198 through 207 at grid 4.5, 8, 8.8, 10) on plan. Provide strand design information including minimum Fe force.Clarify the strand position at each column from the bottom of the bend beam on each level (e.g. refer to grid line 3 sheet GS2.7 and calculation page 102. Is it 9.75” from the bottom of the bend beam? Plan shows 6.25”). Please check each grid where bend beam occurs.Clarify if the end span in the calculation (e.g. page 142) on grid line 10 on each level. Is 8 feet end span correct?Provide slab bend beam design on grid line B at each level. (e.g. sheet GS2.6A). Cross-reference beam construction details and verify the reinforcement, strand location…on plan.Revise plan to call out Pe force and number of strands of the PT-slab along grid line B.3. (e.g. sheet GS2.6 / calculation page 154)Sheet GS7.1, Beam B-1 design. Per calculation page 262, minimum As-6.93 in^2. The provided 4-#11 has 6.24 in^2. Please check the reinforcement amount and clarify on the beam elevation.Cross-reference missing detail at the stairway #2 on grid #9 and #B.4. (e.g. GS2.5A and other sheets)LateralPlease justify the lateral design for Type 3 of the horizontal structural irregularities per ASCE 7-16 Table 12.3-1 at the split level ramp diaphragm. Please justify the lateral design for Type 2 of the vertical structural irregularities per ASCE 7-16 Table 12.3-2 occurs at the amenity level and adjacent level.Show redundancy factor value, ρ, on the structural cover sheet under general notes. For concrete shear wall design, please show justification in the structural calculation if the value is taken as 1 instead of 1.3. (ASCE 12.3.4.2)The occupant load is greater than 300 at the rooftop amenity area. Please verify and clarify with the architect that whether or not the primary occupancy is public assembly in the garage building and building may be classified as Risk Category III. The current structural design is Risk Category II. (CBC Table 1604.5)Please provide additional analysis to justify split ramp diaphragm. Currently the diaphragm is analysis as a single diaphragm.Seismic Drift (ASCE Section 12.12.1): Calculate seismic drift based on deflections of each level with Cd and I factors using strength level forces per ASCE 7 Section 12.8.Separation (ASCE 7 Section 12.12.3): Provide separation justification from adjacent structure(s) on the same property meeting ASCE 7 Section 12.12.3. In the calculation, please also include a copy of floor plan indicating building separation distance between garage and apartment building on all sides.PC 2nd comment: Pending. A complete justification is needed to prove the separation is adequate. Provide calculation and plans are needed to verify on this submission package. Provide sufficient seismic separation is also the responsibility for the structural engineer who design the garage. Specify minimum separation distance on your structural plans.PC 3rd review comment: Pending. All required design, calculation, plans and information must be included in this submittal.Specify minimum shearwall length on each shear wall on plan.Clarify the tie spacing at grid A shear wall grade beam (e.g. sheet GS5.3 / calculation page 489). #7@12” o.c.?FoundationClarify the extent of the ground improvement area. Please attach the ground improvement drawings to the structural plans for reference.PC 2nd comment: Unable to review. A copy of Ground improvement design is not available and needed for reference in this package.PC 3rd review comment: Unable to review. A copy of Ground improvement design is not available and needed for reference in this package.Provide the design of the ground improvement mitigation method (listed by approved agencies. E.g. ICC) to mitigate the effects of liquefaction and for support of the proposed conventional foundation system.PC 2nd comment: Provide a copy of ground improvement design for reference.PC 3rd review comment: Provide a copy of ground improvement design for reference.Show on the tile sheet the name, address and phone number of the Project Geotechnical Consultant and a list of all applicable geotechnical reports, including the addendum of the soils report, dated on March 11, 2021.PC 2nd comment: Not resolved. Please include the addendum of the soils report information on plan. In addition, the architectural sheet GA0.1.0 shows the soils engineer is TBD which need to be corrected.PC 3rd review comment: Not resolved. Provide this information on the structural plan. In addition, the architectural sheet GA0.1.0 shows the soils engineer is TBD which need to be corrected.Please review and revise the title sheet and foundation design based on the recommended allowable soil bearing capacity. The addendum to of the soils report limited the allowable soils bearing pressure to 5,000 psf for the design of the conventional foundations, supported on the stone columns. (current design is based on 7,000 psf)PC 2nd comment: No record of ground improvement submission as of February 22nd, 2022. Theaddendum of soils report for higher soils bearing capacity is also not available on this submission.PC 3rd review comment: No record of ground improvement submission as of April 5th, 2022. The addendum of soils report for higher soils bearing capacity is also not available on this submission.Call out reinforcement size and spacing in the 5” slab-on-grade concrete slab.Per amendment of soils report, all isolated column pad footing shall be connected in at least two directions by grade beams. Please update foundation design. (e.g. interior column location)PC 2nd comment: In your response, verifying with the ground improvement contractor does not supersede the soils report requirements. If you believe by using geopiers can eliminate this requirement, provide evidence from the author of the soils report and provide addendum for geopiers inlieu of grade beam in writing. PC 3rd review comment: Please revise insulated pad footings per soils report recommendations.In your response, verifying with the ground improvement contractor will not supersede the soils report requirements. If you believe by using geopiers can eliminate this requirement, provide addendum in writing from the author of the soils report.Add note to the cover page of the structural plans that “The design of the ground improvement mitigation method to mitigate the effects of liquefaction and for support of the proposed foundation system shall be designed by a licensed professional and reviewed and approved by the geotechnical engineer and the structural engineer in record”.Foundation design shall be reviewed by the geotechnical engineer. Geotechnical report recommendations are considered to be minimum standards. Structural calculations and drawings must meet or exceed said minimum standards. Verification of review may be by a “review stamp” on the foundation plan or by a letter on their letterhead. (1803)PC 2nd comment: In your response: “Foundation plans have been provided to the geotechnical engineer(s) for review”. Please provide evidence of review and approval by the geotechnical engineer.PC 3rd review comment: Please provide evidence of review and approval by the geotechnicalengineer.Retaining wallPlease provide a wall legend and key plan in the calculations, identify the walls calculated, and cross-reference to the details/schedules on the plans. (e.g. elevator pits, garage walls at ramp…)PC 2nd comment: pending.PC 3rd review comment:Missing key plan to cross-reference retaining walls from foundation plan into structural calculation. A recommendation is to provide a 8.5”x11” key plan in the calculation for cross-referencing. (Slipped walls on GS4.1, interior ramp detail 1, 4 on GS1.4)Please indicate page number in the structural calculation content for all retaining wall design.A duplicated sheet GS4.1 is included in the package with incomplete details. Please clarify.Clubhouse / fitnessPlease provide CMU shear wall design, reinforcement, length and details on the framing plan and make cross-reference with the structural connection details. END OF COMMENTS