HomeMy WebLinkAbout276933_3_Corrections.docxPLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101107195 PROJECT ADDRESS: 2010 E Warner Ave Bldg# A Parking Structure PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: I B, SPK OCCUPANCY CLASSIFICATION(S): A-3, S-2 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 8/3/2021 INITIAL REVIEW 8/8/2021 EXPIRATION 1/30/2022 RECHECKS: 1.2/10/22 PROJECT APPLICANT CONTACT PERSON: 2.4/3/22 Heidi Hare 3. TEL: (949)246-0492 FAX: VALUATION: $20,806,674.00 EMAIL: heidi@jlhare.com FLOOD ZONE: X-0602320279J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTSNon-Structural Review by Tung LeTle10@santa-ana.org(714) 647-5896 General Instruction and Approval Required All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans along with one mini set. The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings ((714)573-6100) - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039) - Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039) - School District Compliance Certificate; a copy of the building permit application, signed by the plan check engineer, shall be required by the School District to verify the scope of work. Refer to the attached handout. - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceReminder: Parcel map shall be approved and recorded prior to building permit issuance.Sheet GA1.1: On the plan, please show (setback) distance between buildings on the same lot, from property lines, and from centerline of streets or public alley. 2nd Review Comment: Could not locate Civil plans as mentioned. Please provide site plan showing fire separation distance. 3rd Review Comment: Please incorporate the fire separation distances onto the architectural site plan. Egress Plans (Sheet GA1.2 through GA1.6)Seventh tier second exit access stairway to sixth tier level: The exit access stairway shall be connected to a pedestrian facilities; the vehicle ramp shall not be considered as an exit access ramp. (1006.2.2.5; 406.4.3)2nd Review Comment: Seventh Tier parking means of egress – Vehicle ramp shall not be considered as an exit access ramp. The exit access stairway shall be connected to an pedestrian facilities. 3rd Review Comment: Please provide barrier (bollards) at top and bottom of stairway to prevent vehicle blocking the exit access stairway. Exist passageways are part of the means of egress system for the parking structure – The following information are required: Residential units within primary entrance that opens into the exit passageway: The exit passageway shall not be used for any other purposes. Please coordinate and revise plan accordingly. (1024.1)2nd Review Comment: Please clarify on plan the unit entrances. The exit passageway shall not be used for any other purposes.3rd Review Comment: Pending approval of exit passageway on the apartment building plans. Accessible Path of Travel Plans (Sheet GA1.7 through GA1.11)On the plan, please provide/show detectable warning between the pedestrian circulation path and vehicular area (parking), including the interior stairway at seventh tier. (11B-247.1)2nd Review Comment: Elevator #3, 6/GA6.8 and all floor level; and Elevator #2, 1/GA6.4 at First tier – Please provide/show truncated dome between the pedestrian area and vehicular area (including adjacent to parking spaces). 3rd Review Comment: Elevator #3, 6/GA6.8 and all floor level – Parking space is considered vehicular area – please revise plans to provide/show detectable waring between vehicular area and pedestrian area. Floor plans (sheet GA2.0 through GA2.9)3rd Review Comment:Elevator shafts – Note 65, the smoke guard SD60GS elevator smoke containment is only 60 minutes protection – a 90-minute opening protection is required at elevator shaft opening. Please coordinate and rise plan according. Apply to all elevator shafts.Elevators: Please show/provide two-way communication in accordance with Section 1009.8. 2nd Review Comment: Response was insufficient. Section 1009.8, exception 2 could not be used since vehicle ramps is not considered an accessible means of egress system. Two-way communication is required in accordance with Section 1009.8. 3rd Review Comment: two-way communication is required for the accessible mean of egress elevator. (1009.8)Details Sheets Provide details to show transition between the residential building and parking garage with seismic separation required by structural design – at roof, floor, and door, and etc. Details shall be clearly cross-referenced onto the plan. 2nd Review Comment: For clarity, please provide details for reference. 3rd Review Comment: Referenced detail shall be part of the submittal plan set. Provide fire blockings and smoke barriers in the concealed spaces between parking garage wall and residential wall. Details shall be clearly cross-referenced onto the plan.2nd Review Comment: For clarity, please coordinate and provide details for reference. 3rd Review Comment: Referenced detail shall be part of the submittal plan set. STRUCTURAL REVIEW COMMENTS:Wayne Leewlee@santa-ana.org(714) 647-5848THE FOLLOWING BUILDING PERMIT IS REQUIRED:Submit and obtain building permit (maybe under separate permit) for the design of the ground improvement mitigation method (listed by approved agencies. E.g. ICC) to mitigate the effects of liquefaction and for support of the proposed foundation system. Please note that this soils reinforcement design permit must be approved and issued no later than building permit issuance.PC 2nd comment: No record of submission as of February 22nd, 2022.PLAN CHECK COMMENTSPC 2nd comment: This is incomplete submission. Only (3) sets of new plans are submitted. Structural calculations, geotechnical reports, any supporting documents, and previous plan check set and plan check structural calculation with redlines must be return.Based on the limited available information, only partially reviewed on this plan check. Comments not able to be reviewed is responded as “Pending”.Please refer to plan check set for plan check comments not shown in this list.PC 2nd comment: Pending. Please return the check set.Please provide address on the title block on each sheet. (Refer to architectural sheets for address information)PC 2nd comment: Incorrect address shown. Revise all sheets with correct address: 2010 E Warner Ave, Santa Ana, CA. 92705.Provide sheet index on sheet GS1.1.PC 2nd comment: index is not available on sheet GS1.1. In addition, the structural sheet index shown on architectural plan GA0.1.0 does not match the structural package.On sheet GS1.1, list all structural deferred submittal items on cover sheet. (e.g. stairway construction).Please clarify the PT-slab design at grid B on all levels, except amenity level. Plans and calculation shall be consistent. (e.g. sheet GS2.2, calculation page 160)PC 2nd comment: Pending.Sheet GS2.8A. Please justify the column cap design and dimensions at the middle columns where two columns shared with one cap. E.g. Grid F,5 and F,7.PC 2nd comment: Pending.Sheet GS2.8A. Please add a note on plan to specify the column cap dimensions located at the edge of the slab. E.g. Grid A, 5.7.PC 2nd comment: Pending.LateralPlease justify the lateral design for Type 3 of the horizontal structural irregularities per ASCE 7-16 Table 12.3-1 at the split level ramp diaphragm. PC 2nd comment: Pending.Please justify the lateral design for Type 2 of the vertical structural irregularities per ASCE 7-16 Table 12.3-2 occurs at the amenity level and adjacent level.PC 2nd comment: Pending.Show redundancy factor value, ρ, on the structural cover sheet under general notes. For concrete shear wall design, please show justification in the structural calculation if the value is taken as 1 instead of 1.3. (ASCE 12.3.4.2)PC 2nd comment: Pending.The occupant load is greater than 300 at the rooftop amenity area. Please verify and clarify with the architect that whether or not the primary occupancy is public assembly in the garage building and building may be classified as Risk Category III. The current structural design is Risk Category II. (CBC Table 1604.5)PC 2nd comment: Pending.Please provide additional analysis to justify split ramp diaphragm. Currently the diaphragm is analysis as a single diaphragm.PC 2nd comment: Pending.Seismic Drift (ASCE Section 12.12.1): Calculate seismic drift based on deflections of each level with Cd and I factors using strength level forces per ASCE 7 Section 12.8.PC 2nd comment: Pending.In addition, pleases show calculation page number where the justification can be found.Separation (ASCE 7 Section 12.12.3): Provide separation justification from adjacent structure(s) on the same property meeting ASCE 7 Section 12.12.3. In the calculation, please also include a copy of floor plan indicating building separation distance between garage and apartment building on all sides.PC 2nd comment: Pending.A complete justification is needed to prove the separation is adequate. Provide calculation and plans are needed to verify on this submission package.Provide sufficient seismic separation is also the responsibility for the structural engineer who design the garage. Specify minimum separation distance on your structural plans.Specify minimum shearwall length on each shear wall on plan.PC 2nd comment: Pending.FoundationClarify the extent of the ground improvement area. Please attach the ground improvement drawings to the structural plans for reference.PC 2nd comment: Unable to review. A copy of Ground improvement design is not available and needed for reference in this package.Provide the design of the ground improvement mitigation method (listed by approved agencies. E.g. ICC) to mitigate the effects of liquefaction and for support of the proposed conventional foundation system.PC 2nd comment: Provide a copy of ground improvement design for reference.Show on the tile sheet the name, address and phone number of the Project Geotechnical Consultant and a list of all applicable geotechnical reports, including the addendum of the soils report, dated on March 11, 2021.PC 2nd comment: Not resolved. Provide this information on the structural plan. In addition, the architectural sheet GA0.1.0 shows the soils engineer is TBD which need to be corrected.The soils bearing pressure provided in the calculation exceeds those allowed to use shallow foundation. The addendum to of the soils report limited the allowable soils bearing pressure to 5,000 psf for the design of the conventional foundations, supported on the stone columns. (current design is based on 7,000 psf)PC 2nd comment: No record of ground improvement submission as of February 22nd, 2022. Theaddendum of soils report for higher soils bearing capacity is also not available on this submission.Call out reinforcement size and spacing in the 5” slab-on-grade concrete slab.PC 2nd comment: pending.Per amendment of soils report, all isolated column pad footing shall be connected in at least two directions by grade beams. Please update foundation design.PC 2nd comment: In your response, verifying with the ground improvement contractor does not supersede the soils report requirements. If you believe by using geopiers can eliminate this requirement, provide evidence from the author of the soils report and provide addendum for geopiers inlieu of grade beam in writing.Add note to the cover page of the structural plans that “The design of the ground improvement mitigation method to mitigate the effects of liquefaction and for support of the proposed foundation system shall be designed by a licensed professional and reviewed and approved by the geotechnical engineer and the structural engineer in record”.Foundation design shall be reviewed by the geotechnical engineer. Geotechnical report recommendations are considered to be minimum standards. Structural calculations and drawings must meet or exceed said minimum standards. Verification of review may be by a “review stamp” on the foundation plan or by a letter on their letterhead. (1803)PC 2nd comment: In your response: “Foundation plans have been provided to the geotechnical engineer(s) for review”. Please provide evidence of review and approval by the geotechnical engineer.Retaining wallPlease provide a wall legend and key plan in the calculations, identify the walls calculated, and cross-reference to the details/schedules on the plans. (e.g. elevator pits, garage walls at ramp…)PC 2nd comment: pending.END OF COMMENTS