HomeMy WebLinkAbout284838_1_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101109629
PROJECT ADDRESS:
3921 W Segerstrom Ave
PLAN CHECK ENGINEER:
Le, TungTEL:714
647-5896
EMAIL:
Tle10@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B, SPK
OCCUPANCY CLASSIFICATION(S):
B, F-1
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
3/23/2022
INITIAL REVIEW
4/13/2022
EXPIRATION
9/19/2022
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Sam Pakbaz
3.
TEL:
(303)884-7934
FAX:
VALUATION: $110,000.00
EMAIL:
sam@wearchitectsgroup.com
FLOOD ZONE: X-0602320258J
APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Fire Department approval on the corrected/final sets of drawings ((714)573-6100)
- Police Department approval on the corrected/final set of drawings (647-5840)
- Public Works Agency approval (647-5039)
- Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by
the Public Works Agency (647-5039)
- School District Compliance Certificate; a copy of the building permit application, signed by the plan check
engineer, shall be required by the School District to verify the scope of work. Refer to the attached handout.Plan shall be stamped, signed and dated by the architect of record.
Sheet A0.1: Deferred Submittal, item #6: The prefabricated insulated wall and ceiling panel shall be included and be part of this submittal and approval; it’s not allowed to be as a deferred item.Please provide the following note on the plan: Every Cannabis Business shall implement adequate ventilation system and odor control filtration measures to prevent odors from inside the cannabis facility from being detected outside the cannabis facility, to include building and the unit. A licensed Mechanical engineer shall design the system that is capable of preventing odors from inside the cannabis facility from being detected outside the cannabis facility. The design of the ventilation and filtration system shall be based on industry-specific best control technologies and best management practices to effectively mitigate cannabis odors.Please clearly provide the square footage for each of the applicable areas: Cultivation Distribution/secured storage Manufacturing and processing Testing laboratory (as licensed by the State of California) Retail Sheet A1.1: It appears that the building is located on two (2) separate parcels (lots). Please provide recording record for the lot consolidation. Otherwise, provide a lot-tie agreement to the City for review and approval. Please coordinate and revise site plan accordingly. An accessible route from the public slide walk to the building primary entrance is required. On the plan, please show/provide an accessible route from the public sidewalk to the building. Please provide/show detectable warning at the accessible primary entrance. The detectable (truncated dome) shall be located outside the 5-ft door landing. Sheet A0.5: Egress plan Egress plan review is subject to the lot consolidation and/or lot-tie agreement. Please show door landing and maneuver space for all exterior doors (both sides of door). Sheet AD1.1: Please coordinate with lot lines comment on sheet A1.1. Sheet A2.1: Insulated prefab wall panel: please provide wall specification and construction details, and including listing number for the prefab wall panels. Please show/provide door landing and maneuver spaces for the exterior doors. New exterior concrete wall: For clarity, please provide a different wall line type (legend) to distinguish between new wall and existing wall. Wall constructions: Please construction details and clearly cross-reference detail onto the plan. Doors: Please clearly cross-reference to sheet A9.1 for door information. Accessible restroom: On the plan, please clearly cross-reference to sheet A8.1 for restroom plan and detail. Each building shall be provided with a separate sanitation facility (restroom). Sheet A3.1: Ceiling construction: Please cross-reference ceiling details onto the plan. Sheet A10.0 & A10.1: Please clearly cross-reference details onto the plans. Delete/omit detail that does not apply to the project. Structural Review Comment: Sheet ST-1: Foundation detail referenced to ST.1 was not applicable. Please revise detail callout to sheet SD-1 for correct details. Sheet ST-1: Provide detail to show new footing and slab positive connection to existing footing/slab. Clearly cross-reference detail onto the plan. Existing opening giving access between two building (coordinate with floor plan) – Please verify and provide reinforcement (support) for the opening as necessary. Sheet ST-1: Referenced detail 6/SD.2 for both existing and new condition was not applicable. Please provide detail for wall tie connection at existing wall with through bolt or epoxy bolt. Detail 6/SD.2: Please specify size of horizontal hold-down (tie) anchor for the HDU8. New addition: Provide calculation for the new building exterior wall for vertical and lateral loads. Provide calculation for out-of-plane loads. Provide calculation for roof framing members and roof diaphragm. Provide calculation for the CO2 tanks. On the plan, please provide tanks specification.
(End of Comment)