HomeMy WebLinkAbout285845_1_Corrections.docxRESIDENTIAL PLAN CHECK
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101109895
PROJECT ADDRESS:
2202 N Santiago St
PLAN CHECK ENGINEER:
Huang, GaryTEL:714
647-5862
EMAIL:
Ghuang@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
U
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
3/25/2022
INITIAL REVIEW
4/5/2022
EXPIRATION
9/21/2022
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Kathryn Wilson
3.
TEL:
(310)749-1899
FAX:
VALUATION: $70,000.00
EMAIL:
kwcostumes@gmail.com
FLOOD ZONE: X-0602320163J
GUIDELINES:
Comments contained within this report reflect only those of the Building and Safety Division. Additional comments or corrective action may be required by other Departments and/or outside Agencies
This Plan Review Report and all subsequent code references are based upon the most recent version(s) of the 2019 California Building Codes (CBC, CRC, CFC, CEC, CPC, CMC, CGBSC, and CEES)
The approval of plans and any supporting documents does not permit the violation of any section of the adopted building codes or other pertinent local ordinances, or state and federal laws
All listed plan review comments must be adequately addressed before a building permit can be issued
Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.
Please see correction on submitted plans. Red marked set must be returned with revised plans. Plans resubmitted without the red markup set may result in delayed review time and additional plan check fees.
PLAN REVIEW COMMENTS:
Applicant shall address all the checked‘☒’ correction comments below before resubmitting plans to Building Safety for recheck.
☒1. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
☒Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process.
☐Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700).
☐Police Department approval on the corrected/final set of drawings (647-5840).
☒Public Works Agency approval (647-5039).
☐Proof of Worker's Compensation Insurance shall be required at the time of permit issuance.
☐School District Approval; and a copy of the school fee worksheet, completed by the plan check engineer, shall be required by the School District to verify the scope of the work.
☐Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039).
☐2. This project is in a special flood hazard area designated on the flood insurance rate map (FIRM) as zone A or AE. This zone requires that the lowest finish floor elevation (including basement) of the structure shall be at (or above) base flood elevation determined by a hydrology study for the A zone, or at (or above) the base flood elevation specified for the AE zone, on the flood insurance rate map. All elevations must be referenced to the National Geodetic Vertical Datum. Reference should be made to the Flood Plain Management Ordinance, Santa Ana Municipal Code, Chapter 7, for complete requirements. Drawings shall show compliance with said ordinance including noting flood zone and finish floor elevation."
☐3. Note on plans: "A Federal Emergency Management Agency National Flood Insurance Program ELEVATION CERTIFICATE shall be completed by a California Licensed Land Surveyor or California Registered Civil Engineer who is authorized to practice land surveying. The completed ELEVATION CERTIFICATE must be submitted to the Building Inspector at the time of foundation inspection, and a FINAL CERTIFICATE must be submitted at the time of final inspection."
☒4. Provide a project description with a complete and detailed scope of work on the cover sheet of the plans.
☒5. Note on plan: All concealed work installed without permits must be exposed for inspection to the satisfaction of the Building Inspector. This includes methods of attachment and all footings, structural members, mechanical, electrical, plumbing and insulation.
☐6. Provide the following design data on the first sheet (R106.1.1)
☐Occupancy groups (R-3/U)
☐Type of construction (V-B)
☐Automatic Fire Sprinkler (YES or NO)
☐Number of stories.
☐Floor area per occupancy group, including the existing structure(s)
☐Construction shall comply with the 2019 CRC, CBC, CPC, CMC, CEC, California Green Building Code, and California Energy Efficiency Standards Code editions.
☒7. Note on plan: Mechanical, electrical and plumbing are not part of this plan review and approval. MEP are subject to building field inspection.
☒8. Show/provide safety glass in hazardous locations (R308) –
☒Glazing in doors – all fixed and operable panels of swinging, sliding and bifold doors.
☒Glazing within 24” of door and those bottom edge is less than 60”.
☒Glazing with exposed area more than 9 sq. ft with bottom edge is located less than 18” above the walking surface and top edge is located more than 36” above the floor.
☒9. Means of egress / Doors – (R311)
☐All dwellings shall provide with a means of egress. The means of egress shall provide a continuous and unobstructed path. Provide minimum one side-hinged door with minimum clear width of 32 inches and 78 inches clear height (3’-0” x 6’-8” door).
☒On the plan, provide a landing or floor on each side of each exterior door. Landing shall have width of not less than the door served and a minimum of 36” measured in the direction of travel.
☒Landing shall not be 1 ½” lower than the top of the threshold when doors swing over the landing or floor; otherwise, landing can be 7 ¾” maximum lower than the top of the threshold.
☒10. Detail corrosion–resistant weep screed minimum of 4” above the earth or 2” above paved areas. (R703.7.2.1)
Structural Plan Review Comments:
☒7. Footing shall be embedded minimum 18” below the finish grade with two (2) #4 reinforcing bars at top and bottom (total 4 re-bars). ☒Additional Review Comment:
Provide note on plan that this shed is not habitable and non-conditioned area; otherwise provide title 24 calculation and other requirement comply with CBC 2019
Provide attached 2019 Low-Rise Residential Mandatory Measure on plan
Provide structural gravity/lateral calculation comply with CBC 2019 for review
Sheet A100:
Detail 1: Indicate location of 6 ¾ GLB
Detail 6: Provide building with weather-resistant exterior wall envelope
Detail 4: justify 2x6 drag is adequate
General notes: provide construction detail of panel to panel connection on plan
Sheet A200:
Detail 1: indicate on plan that French doors and casement shall be tempered glass
Sheet A300:
Detail 11: footing width no found on plan. Provide footing width
Red marked comment set is available to pick-up at the City Hall. (End of Comment)