HomeMy WebLinkAbout284297_2_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101109463 PROJECT ADDRESS: 513 E Fifteenth St PLAN CHECK ENGINEER: Lo, JonathanTEL:714 647-5822 EMAIL: Jlo@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3, U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 2/16/2022 INITIAL REVIEW 3/10/2022 EXPIRATION 8/15/2022 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. VahidBehroozi 3. TEL: (949)870-0048 FAX: VALUATION: $30,000.00 EMAIL: oclandconstruction@yahoo.com FLOOD ZONE: X-0602320163J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2019 California Residential Code (CRC); 2019 California Building Code (CBC); CMC = 2019 California Mechanical Code; CPC = 2019 California Plumbing Code; CEC = 2019 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5822 for an appointment. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: ☒Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. ☒Public Works Agency approval (647-5039). ☐Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700). ☒Police Department approval on the corrected/final set of drawings (647-5840). ☒School District Approval; and a copy of the school fee worksheet, completed by the plan check engineer, shall be required by the School District to verify the scope of the work. ☐Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. ☐Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039).Comments have been provided on drawing and calculation hard copies in relation to all comments below. These may be picked up at Building and Planning department at applicants’ discretion.Documentation Energy Conservation – Title 24 Energy forms & calculations 1. Provide documentation to demonstrate compliance with the California Energy Code. 2. Climate zone 8 is used. 3. Compliance forms with signatures must be provided on plans.DrawingsSheet A0.1 Provide the following design data on the first sheet (R106.1.1) ☒Flood Zone: X ☒Automatic Fire Sprinkler (YES or NO)Add note on the coversheet: Photovoltaic system will be submitted under a separate permit and shall be issued prior to building frame inspection request.Provide Site Drainage and flow direction around new detached ADU on Site Plan or provide drainage plan.5’-0” Minimum distance between (N) ADU and (E) Units.Sheet A0.6Add North Arrow on planAdd detail references/locations on floor legend or notes to identify where window/door/wall schedules may be found.Note on plan: Mechanical, electrical and plumbing are not part of this plan review and approval. MEP are subject to building field inspection.Every dwelling unit shall be provided with heating facilities capable of maintaining a room temperature of not less than 68°F (20°C) at a point 3 feet (914 mm) above the floor and 2 feet from exterior walls in habitable rooms at the design temperature. The installation of one or more portable space heaters shall not be used to achieve compliance with this section. (R303.9)Sheet S101Specify if roof rafter called out on Grid 1 and 2 are atop walls or if Alt. condition to be used. If atop walls, provide detail for shear transfer.HFX sheets have not been provided, please provide.(End of Comment)