HomeMy WebLinkAbout285918_1_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101109921
PROJECT ADDRESS:
1901 W Walnut St
PLAN CHECK ENGINEER:
So, AnsonTEL:714
647-5830
EMAIL:
aso@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
B
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
3/30/2022
INITIAL REVIEW
5/5/2022
EXPIRATION
9/26/2022
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Luis Sarmiento
3.
TEL:
(714)987-2009
FAX:
VALUATION: $33,000.00
EMAIL:
thrivesantaana@gmail.com
FLOOD ZONE: X-0602320257J
APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5830 for an appointment.Sheet A0.00The city were notified that the soil remediation is required on this site. An environmental review agency shall review and approve the soil remediation prior to the building permit issuance.Provide energy compliance documentation for containers that occupies humans.Submit plans to the Health Department for review. The retail shop appears to be a Café.Sheet A1.00Cross-reference the accessible parking space details from the site plan.Cross-reference the curb-ramp detail near the accessible parking space.Provide a ramp detail. There are six ramps on the site. Specify slope and length dimensions. Provide accessible ramp detail if the ramp slope exceed 5%.Provide legends for different floor surface materials. Floor surface material shall be firm, slip resistance, and stable.Provide details for the perimeter fence.Provide occupant load at the framing areas for plumbing fixture calculations.Show the “EXIT” signage at the exit gates.Setback the double gates away from the public streets to accommodate a landing that is within the property line.At the exit gate near the Outdoor Community area, change the gate-swing direction towards Walnut Street. Please use a dotted line or dashed line to demonstrate accessible routes to all entrance of the containers.Dimension the path width near the exit gate at the corner of Walnut Street and Daisy Avenue.The plan shows the following note: “All site work (curbs, ramps, steps, benches, fences, lighting and stage), parking and landscape done in phase 1”. Define phase 2 and specify the phase that is not included on this submittal shall be a separate submittal.Sheet S1.01Please change the name of the jurisdiction to City of Santa Ana under the Deferred Approval Items on sheet S1.01.[END]