HomeMy WebLinkAbout282101_3_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101108809
PROJECT ADDRESS:
2525 W Westminster Ave
PLAN CHECK ENGINEER:
Le, TungTEL:714
647-5896
EMAIL:
Tle10@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
B, M
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
12/7/2021
INITIAL REVIEW
12/20/2021
EXPIRATION
6/5/2022
RECHECKS:
1.4/5/2022
PROJECT APPLICANT CONTACT PERSON:
2.
Kevin Le
3.
TEL:
(626)275-6800
FAX:
(626)275-6801
VALUATION: $150,000.00
EMAIL:
mail@le-architecture.com
FLOOD ZONE: X-0602320144J
APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Police Department approval on the corrected/final set of drawings (647-5840)
- Public Works Agency approval (647-5039)Sheet T1.0: Scope of work: Scope of work described on plan appeared incomplete – Please review and revise scope of work to include the following: Shell tenant improvement (T.I) for unit A, F, G, H, and I with new single user restroom. 2nd Review Comment: MEP are under a separate plan review. Please revise scope of work to clearly specify “shell tenant improvement for unit A through I”. Scope of work: Item #3 and 4 – Electrical and mechanical are under separate permit application and review. Please omit item #3 and #4 from plan. 2nd Review Comment: Please Scope of work item #3 and 4 – please omit or note “Under Separate Review”. Sheet A1.0: 2nd Review Comment: Please omit/remove the front trellis structure from plan. The rear metal canopy and loading dock will be submitted under a separate permit application. Please coordinate and revise plan to reflect with the permit application and scope of work. Demo plan: Please show existing walls to be removed at the rear of suite #A. Please provide floor plan and detail for existing restroom to show compliance with the accessible requirement per current code. New CMU wall between storage warehouse: Please provide fire-wall termination at roof details. Detail shall be clearly cross-referenced onto the plan. Structural Review Comment: 2nd Review Comment: The rear metal canopy and loading dock will be submitted under a separate permit application. Please coordinate and revise plan reflect with the permit application and scope of work. Remove/omit information that do not apply to this permit application as necessary. Detail 5/S-4: Please verify whether positive connection between masonry wall and roof diaphragm is required for the new exterior mason wall. Detail B & C on sheet S-5: Please show/explain how the new CMU wall is supported for out-of-plan loads at top of wall. Revise detail as necessary. Detail A on sheet S-5: Please provide/show positive connection between lower roof to CMU wall.