Loading...
HomeMy WebLinkAbout286463_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101110102 PROJECT ADDRESS: 1325 E Seventeenth St PLAN CHECK ENGINEER: Lo, JonathanTEL:714 647-5822 EMAIL: Jlo@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: II B OCCUPANCY CLASSIFICATION(S): A-2 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 4/14/2022 INITIAL REVIEW 4/26/2022 EXPIRATION 10/11/2022 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Marissa Alvarado 3. TEL: (626)334-5600 FAX: VALUATION: $20,000.00 EMAIL: marissa@bksigns.com FLOOD ZONE: X-0602320163J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5822 for an appointment.Please return marked up set of drawings with corrections.Comments have been provided on drawing and calculation hard copies in relation to all comments below. These may be picked up at Building and Planning department at applicants’ discretion.DrawingsSheet 13 of 16Coordinate Clearance Sign baseplate and anchorage with structural drawings.Sheet Structural Drive-Thru Canopy Sheet 1 of 2Provide (3) ties at top 5” of foundation per ACI 318 Section 10.7.6.1.5.Ties provided in foundation are to be circular or spiral in pier foundation.Sheet Structural Drive-Thru Canopy Sheet 2 of 2Verify 5/16” weld at 1/4” HSS post to cap plate and baseplate.Provide (3) ties at top 5” of foundation per ACI 318 Section 10.7.6.1.5.Sheet Structural Clearance Bar Sheet 1 of 1Provide (3) ties at top 5” of foundation per ACI 318 Section 10.7.6.1.5.Ties provided in foundation are to be circular or spiral in pier foundation.Coordinate anchor bolt size with design sheets.Sheet Structural Directional Sheet 1 of 1Provide (3) ties at top 5” of foundation per ACI 318 Section 10.7.6.1.5.Ties provided in foundation are to be circular or spiral in pier foundation.CalculationsDrive-Thru Canopy Anchorage Calculations: Please justify using rebar to eliminate concrete breakout with requirements per ACI 318 Section 17.5.2.1.(End of Comment)