HomeMy WebLinkAbout283246_2_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101109147
PROJECT ADDRESS:
3701 W Moore Ave
PLAN CHECK ENGINEER:
Lee, WayneTEL:714
647-5848
EMAIL:
wlee@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
III B, SPK
OCCUPANCY CLASSIFICATION(S):
B, F-1, S-1
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
1/18/2022
INITIAL REVIEW
2/10/2022
EXPIRATION
7/17/2022
RECHECKS:
1.04/25/2022
PROJECT APPLICANT CONTACT PERSON:
2.
Paula Harris
3.
TEL:
(562)216-5244
FAX:
VALUATION: $50,000.00
EMAIL:
pharris@kkaia.com
FLOOD ZONE: X-0602320258J
APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTSThe applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Fire Department approval on the corrected/final sets of drawings ((714)573-6100)
- Police Department approval on the corrected/final set of drawings (647-5840)
- Public Works Agency approval (647-5039)Plan check comments:**There is no red lines on the drawings and structural calculation.Provide specification of the new door in the new dry room C106. Cross-reference it into the door schedule.STRUCTURAL. Please have the structural engineer in record response the structural comments.All IP sheets shall be stamped, signed and dated by the engineer of record.Sheet IP.5 is removed from the package. Please clarify.Sheet IP-1.1. Design and detail the header of the door, supporting insulated ceiling (e.g. door at room #118). Provide calculation to verify the header capacity. Provide details and specify connection hardware to show continuous load path to the foundation.END OF COMMENTS