Loading...
HomeMy WebLinkAbout282819_3_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101109025 PROJECT ADDRESS: 705 E Alton Ave PLAN CHECK ENGINEER: Lee, WayneTEL:714 647-5848 EMAIL: wlee@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: III B OCCUPANCY CLASSIFICATION(S): B, S-1 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 1/4/2022 INITIAL REVIEW 1/17/2022 EXPIRATION 7/3/2022 RECHECKS: 1.04/04/2022 PROJECT APPLICANT CONTACT PERSON: 2. Chris Savage 3. TEL: (949)341-0920 FAX: VALUATION: $40,000.00 EMAIL: chris@rga-architects.com FLOOD ZONE: X-0602320278J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTSThis review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings ((714)573-6100) - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039)Provide structural engineering design, calculation and details for the new exterior door opening. PC2: There is no written response to this item. The resubmitted plans shows no changes to the previous submittal.Please design, calculation and details the framing, lintel and support for the new door opening within the existing concrete exterior wall. Please design to support the vertical load, in-plane shear force and out-of-plane force.Please review calculation page 5-10. Please clarify and explain why the design force in the concrete wall out-of-plane check using service level load instead of strength level? Please response and revise calculation to clarify.END OF COMMENTS