Loading...
HomeMy WebLinkAbout284147_2_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101109416 PROJECT ADDRESS: 3002 S Deegan Dr Unit# 2 PLAN CHECK ENGINEER: Lo, JonathanTEL:714 647-5822 EMAIL: Jlo@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 2/10/2022 INITIAL REVIEW 3/1/2022 EXPIRATION 8/9/2022 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Albert Luu 3. TEL: (714)858-5959 FAX: VALUATION: $110,000.00 EMAIL: albert.luu@hotmail.com FLOOD ZONE: X-0602320259J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2019 California Residential Code (CRC); 2019 California Building Code (CBC); CMC = 2019 California Mechanical Code; CPC = 2019 California Plumbing Code; CEC = 2019 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5822 for an appointment. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: ☒Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. ☒Public Works Agency approval (647-5039). ☐Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700). ☒Police Department approval on the corrected/final set of drawings (647-5840). ☒School District Approval; and a copy of the school fee worksheet, completed by the plan check engineer, shall be required by the School District to verify the scope of the work. ☐Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. ☐Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039).Comments have been provided on drawing and calculation hard copies in relation to all comments below. These may be picked up at Building and Planning department at applicants’ discretion.DrawingsSheet A-2Provide North Arrow on each individual planFor an FAU located in the attic, provide a 30-inch deep work platform and electric light outlet adjacent to the furnace and switched by the opening (CMC 904.11 & 305) Note on plan: Mechanical, electrical and plumbing are not part of this plan review and approval. MEP are subject to building field inspection.Provide U-Factor and SGHC for openings in Window & Door Schedule.Sheet A3Add proposed site address on new ADU on elevations.Sheet S-1Identify posts as required at ends of shear walls on foundation plan and reference legend.Verify ceiling joist [4] to extend to end of bedroom, else provide ceiling joist.Provide detail and required length of strap [2] between Grid 2 and 3 for chord/shear transfer at building return.Foundation Note 1: New slab on grade shall have #4 rebar minimum. Sheet SD-1Detail 1 – New slab on grade shall have #4 rebar minimum.Detail 4 – Simpson base requires 3” minimum side cover in all sides.Detail 5 – Simpson base requires 3” minimum side cover in all sides.Detail 8 – Provide landing step information on plan.Detail 9 – Provide collar tie location from high point of ridge as well as top of walls.Detail 14 – Note numbers are missing, please provide. (End of Comment)