HomeMy WebLinkAbout281327_4_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101108529
PROJECT ADDRESS:
1851 E First St Unit# 1000
PLAN CHECK ENGINEER:
Ahangian, KathyTEL:714
647-5812
EMAIL:
Kahangian@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
I A, SPK
OCCUPANCY CLASSIFICATION(S):
B
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
11/10/2021
INITIAL REVIEW
11/20/2021
EXPIRATION
5/9/2022
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Emin Narmanli
3.
TEL:
(949)608-3723
FAX:
VALUATION: $276,680.00
EMAIL:
enarmanli@saaia.com
FLOOD ZONE: X-0602320277J
APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.Please return marked up set of drawings with corrections.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Public Works Agency approval (647-5039)
- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceProvide the following:
- Disabled access compliance must be shown on the site plan. Enlarge parking and path of travel to show complies with accessibility.Provide typical section view detail of all new partitions and ceilings showing:
- Method of attaching framing to the building structure ( Structure above) Compliance shall be shown with CBC Section 1607.13 for lateral support of the walls. Do not support top of walls to suspended ceiling system unless calculations and drawing prepared by a registered engineer are submitted for review. Submit structural engineering
calculations for walls in rooms with a floor to building structure above height greater than 14’. Provide detail for 1- hr fire rated infill wall for office 1030.Provide on the drawings a complete door schedule, showing: (For existing doors )
- Door sizes
- Hardware complying with exiting and disabled accessibility requirements
- Fire-rating of door assembly complying with CBC Section 715 Opening ProtectionNote on drawing: “Exit doors shall be openable from the inside without the use of a key or any special knowledge or effort.” Show microwave complies with accessibility.Show sink in coffee room # 1066 complies with accessibility.CBC Section 11B-404.2.7, Hand-activated door opening hardware shall be centered between 30” and 44” above the floor. Latching and locking doors that are hand activated and which are in a path of travel shall be operable with a single effort by lever-type hardware, by panic bars, push-pull activating bars, or other hardware designed to provide passage without requiring the ability to grasp the opening hardware. Locked exit doors shall operate as above in egress direction.CBC Section 11B-404.2.9, Note on the drawings: “Maximum effort to operate doors shall not exceed 5 pounds for exterior doors and interior doors, such pull or push effort being applied at right angles to hinged doors and at the center place of sliding or folding doors. Compensating devices or automatic door operators may be utilized to meet the above standards. When fire doors are required, the maximum effort to operate the door may be increased to the minimum allowable by the appropriate administrative authority, not to exceed 15 pounds. Show reception desk complies with accessibility.Show clearance 17”- 18” clearance from the center of toilet to the wall.Drawings submitted to the Building Division for review shall provide the following information to insure compliance with CBC Section 11B-202.4.
- An accessible entrance
- An accessible route to the altered area
- Accessible restrooms
- Accessible telephone (if any)
- Accessible drinking fountains, and
- Parking, signage and alarmsComplete the attached Disabled Accessibility Documentation Form.Provide on the drawings a complete window schedule showing:( For sidelights)
- Window sizes
- Type and thickness of glazing (type of safety glazing for hazardous locations noted under CBC Section 2406.Provide a complete suspended ceiling system plan and section detail showing the following( For new T-bar area )
- Vertical supports
- Seismic wires
- Seismic strut/Compression strut
- Perimeter wires
- Separate fixture wires for lights and mechanical devices
- ICC Research Report number for the suspended ceilingNote ICC Research Report Number on the drawings for the suspended ceiling system. (ICC Report Number 1308)