PLAN CHECK NO:
101108941
PROJECT ADDRESS:
2250-2252 N Bristol St
PLAN CHECK ENGINEER:
Lee, WayneTEL:714
647-5848
EMAIL:
wlee@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
R-3, U
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
12/16/2021
INITIAL REVIEW
2/3/2022
EXPIRATION
6/14/2022
RECHECKS:
1.04/20/2022
PROJECT APPLICANT CONTACT PERSON:
2.
Frank Yi
3.
TEL:
(626)873-0768
FAX:
VALUATION: $35,000.00
EMAIL:
frankhygolbal@gmail.com
FLOOD ZONE: X-0602320144J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2019 California Residential Code (CRC); 2019 California Building Code (CBC); CMC = 2019 California Mechanical Code; CPC = 2019 California Plumbing Code; CEC = 2019 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.
This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information.
The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
-Planning Division approval on the corrected/final set of drawings (647-5804). Previously
approved plans should be submitted to expedite the process.
-Public Works Agency approval (647-5039).
Sheet T-1. Scope of work. Add interior kitchen remodel scope of work into the unit 2250.
Sheet A-1. Provide interior dimensions on the proposed floor plan to locate all new walls.
Sheet A-1. Unit 2250. In the Northeast bedroom, clarify if a new wall and new hallway is created. This wall is not shown on the existing floor plan, but it shows existing on the proposed floor plan. Please clarify.
Sheet A-1. Unit 2250. In the Northeast bedroom, clarify if a new wall and new hallway is created. Show width of the new hallway and not less than 36” in width.
Sheet A-1. Please label the unit separation wall with (N) or (E) to identify weather this is a new wall.
Sheet A-1. Per plan, a new wall is proposed between units. 1-hour fire barrier wall is required to separate dwelling units. Identify location of fire barrier wall with 1-hour wall assembly detail on plan. Show construction method for 1-hour wall.
Sheet A-4. In building section A-A, show fire-separation from finish floor to the underside of the roof sheathing.
Sheet A-1. At the door #4, revise plans to indicate that a landing, with a width not less than the width of door and length in the direction of travel of not less than 36 inches, on each side of doors. [2019 CRC R311.3.1].
ENERGY (Duplex)
UNIT 2250-The air conditioning system is altered per energy design. Show location of the new heat pump on plan.
UNIT 2252-The air conditioning system is altered per energy design. Show location of the new heat pump on plan.
STRUCTURAL
Provide page number on each page of the structural calculation.
Refer to shear wall design RB1 and RC1. Provide dimensions on the key plan to clarify the tributary area: Ry1: 7.5 feet, Ry2: 7.5 feet and Ry3: 7.5 feet. Please include the roof overhang into tributary area.
Foundation plan. Provide sill plate anchor detail into the existing concrete footing on all shear wall retrofit location and cross-reference into the foundation plan at the applicable location. (In addition to retrofit notes)
END OF COMMENTS