Loading...
HomeMy WebLinkAbout287583_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101110434 PROJECT ADDRESS: 1900 E Seventeenth St PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): B, M, S-1 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 5/18/2022 INITIAL REVIEW 5/23/2022 EXPIRATION 11/14/2022 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Joseph Han 3. TEL: (213)703-4780 FAX: VALUATION: EMAIL: joseph@eldendevelopment.com FLOOD ZONE: X-0602320164J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process.Please provide a narrative of the revisions. Provide structural calculation for the glass guardrails and its support. Guardrails shall be design for linear loads and concentrated loads per Section 1607.8 CBC. Glass guardrails anchor and their support system shall be designed using a factor of safety of four (4). (2407.1.1 CBC)