HomeMy WebLinkAbout287583_1_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101110434
PROJECT ADDRESS:
1900 E Seventeenth St
PLAN CHECK ENGINEER:
Le, TungTEL:714
647-5896
EMAIL:
Tle10@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
B, M, S-1
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
5/18/2022
INITIAL REVIEW
5/23/2022
EXPIRATION
11/14/2022
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Joseph Han
3.
TEL:
(213)703-4780
FAX:
VALUATION:
EMAIL:
joseph@eldendevelopment.com
FLOOD ZONE: X-0602320164J
APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.Please provide a narrative of the revisions. Provide structural calculation for the glass guardrails and its support. Guardrails shall be design for linear loads and concentrated loads per Section 1607.8 CBC. Glass guardrails anchor and their support system shall be designed using a factor of safety of four (4). (2407.1.1 CBC)