Loading...
HomeMy WebLinkAbout278988_5_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101107833 PROJECT ADDRESS: 1016 N Flower St PLAN CHECK ENGINEER: Lee, WayneTEL:714 647-5848 EMAIL: wlee@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3, U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 8/31/2021 INITIAL REVIEW 9/28/2021 EXPIRATION 2/27/2022 RECHECKS: 1.03/16/2022 PROJECT APPLICANT CONTACT PERSON: 2.5/6/2022 Benito Corona 3. TEL: (714)371-7176 FAX: (914)339-8869 VALUATION: $40,000.00 EMAIL: bcndesigner@sbcglobal.net FLOOD ZONE: X-0602320144J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2019 California Residential Code (CRC); 2019 California Building Code (CBC); CMC = 2019 California Mechanical Code; CPC = 2019 California Plumbing Code; CEC = 2019 California Electrical Code; T = Table; ICC = International Code Council. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: -Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. -Public Works Agency approval (647-5039). PLAN CHECK COMMETNS Sheet T24-1. Add new 5’x6’8” glazed door into section I fenestration design in energy calculation. Plan review response: Energy design is not revised which does not design new glazed door. According to building elevation and note #4 on sheet A-1, glazed door is provided. However, note #5 on sheet A-2 shows solid cord door. Please make design consistent on architectural plans and energy design. STRUCTURAL At the exterior wall of the kitchen with enlarged opening for the new glazed door, provide lateral force resisting system design along the exterior wall. Provide structural calculation and lateral shear transfer detail at the top and at the bottom of the shear wall. Plan review response: Provide shear transfer detail showing load path from roof diaphragm to strong-wall. Revise strong-wall concrete grade beam width to 33” and show minimum edge distance 17.5” on the foundation plan. (per calculation page 12) Attach standard Simpson Strong wall manufacture detail sheetsto show connections at top and bottom of new 18 “Strong wall panel. Plan review response: Plans to be signed and dated by the licensed design professional. END OF COMMENTS