HomeMy WebLinkAbout287801_1_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101110506
PROJECT ADDRESS:
2603 W Westminster Ave
PLAN CHECK ENGINEER:
Le, TungTEL:714
647-5896
EMAIL:
Tle10@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
III B, SPK
OCCUPANCY CLASSIFICATION(S):
F-1, M, S-1
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
5/23/2022
INITIAL REVIEW
6/30/2022
EXPIRATION
11/19/2022
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
James Wevv
3.
TEL:
(909)622-7404
FAX:
VALUATION: $35,000.00
EMAIL:
james.johninstall@gmail.com
FLOOD ZONE: X-0602320144J
APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Fire Department approval on the corrected/final sets of drawings ((714)573-6100)
Sheet T1.0: Please update scope of work to reflect with plan and building permit application (for storage racks and gondola shelving). Please update information under Separate Permit. Please update Sheet Index to match with provided plans. Sheet SD.1, A1.0, A1.1, and A1.8: Please note on plan “FOR REFERENCE ONLY”.Sheet MX-5: Detail 4: Please provide detail to show attachment of storage shelves to concrete slab, including minimum anchor bolt embedment. Details shall be clearly cross-referenced onto the plan. Please coordinate detail with structural calculation. Sheet NG-3A: Please provide detail of rack attachment to concrete slab. Show seismic base plate, anchor bolts, and embedment information. Please coordinate with structural calculation. (End of Comment)