Loading...
HomeMy WebLinkAbout288354_1_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101110671 PROJECT ADDRESS: 501 E Memory Ln PLAN CHECK ENGINEER: Lee, WayneTEL:714 647-5848 EMAIL: wlee@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: N/A OCCUPANCY CLASSIFICATION(S): U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 6/3/2022 INITIAL REVIEW 6/14/2022 EXPIRATION 11/30/2022 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Steve Lazarian, Jr. 3. TEL: (626)795-9803133 FAX: (626)795-8838 VALUATION: EMAIL: s.lazarian@cityworksinc.org FLOOD ZONE: X-0602320163J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2019 California Residential Code (CRC); 2019 California Building Code (CBC); CMC = 2019 California Mechanical Code; CPC = 2019 California Plumbing Code; CEC = 2019 California Electrical Code; T = Table; ICC = International Code Council. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: -Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings (647-5839 or 647-5700) - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039) Sheet A0.1. Per sheet index, please submit sheet S1.1. Sheet A0.1. Revise sheet index to include all sheets in the sheet index. Sheet E.6 is not part of the original approved plans per plan check #101108468. On sheet E.6, please revise landing design and gate location to provide level area 60” in direction of gate swing, 48” opposite gate swing, 24” (exterior) jamb clearance. The required 24” clearance shall all be in the pedestrian gate landing, not encroach into the vehicular way. On sheet E.6, provide all missing details shown on the notes on the drawings: 1/D2, 1/D3, 1/D5, 1/D6, 1/D7, 2/D7 and 1/D8 for review. If sheet E1 through E5 are part of the construction document, submit those plans for plan review and approval. All drawings shall be reviewed, approved, stamped, signed and dated by the license architect of record. END OF COMMENTS