Loading...
HomeMy WebLinkAbout288397_1_Corrections.docxSPC PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101110686 PROJECT ADDRESS: 2800 N Main St Unit# 601 PLAN CHECK ENGINEER: Lee, WayneTEL:714 647-5848 EMAIL: wlee@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: II B, SPK OCCUPANCY CLASSIFICATION(S): A-3 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 6/6/2022 INITIAL REVIEW 6/6/2022 EXPIRATION 12/3/2022 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Iscolina Delgado 3. TEL: (626)222-7669 FAX: VALUATION: EMAIL: StarbucksPC@HestiaAtelier.com FLOOD ZONE:X-0602320163J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTSThe applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process.In the truss calculation, provide additional page(s) showing the location and numbering of each node and member to locate each node and member in RISA analysis.Per sheet 3.0, the existing concrete slab requires to support maximum 6.95 kips column load. The engineer of record in responsible charge of the building structural design shall provide a statement stating that he or she has reviewed and approved for loads, location, and suitability for intended use. Provide approval stamp with signature from the engineer of record on the truss plan or on a 8.5”x11” letter.END OF COMMENTS