Loading...
HomeMy WebLinkAbout285918_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101109921 PROJECT ADDRESS: 1901 W Walnut St PLAN CHECK ENGINEER: So, AnsonTEL:714 647-5830 EMAIL: aso@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 3/30/2022 INITIAL REVIEW 5/5/2022 EXPIRATION 9/26/2022 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Luis Sarmiento 3. TEL: (714)987-2009 FAX: VALUATION: $33,000.00 EMAIL: thrivesantaana@gmail.com FLOOD ZONE: X-0602320257J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5830 for an appointment.Sheet A0.00First Plan Review Comments: The city were notified that the soil remediation is required on this site. An environmental review agency shall review and approve the soil remediation prior to the building permit issuance.Response: THRIVE to continue to work with the City for resolution.Second Plan Review Comments: Item #5 is a condition of approval.Provide energy compliance documentation for containers that occupies humans.Submit plans to the Health Department for review. The retail shop appears to be a Café.Sheet A1.00Cross-reference the accessible parking space details from the site plan.Second Plan Review Comments: Please provide the landscape drawings for reference. The responses from item 9 through 12 references the landscape drawings for details.Cross-reference the curb-ramp detail near the accessible parking space.Provide a ramp detail. There are six ramps on the site. Specify slope and length dimensions. Provide accessible ramp detail if the ramp slope exceed 5%.Provide legends for different floor surface materials. Floor surface material shall be firm, slip resistance, and stable.Provide details for the perimeter fence.Provide occupant load at the framing areas for plumbing fixture calculations.Show the “EXIT” signage at the exit gates.Setback the double gates away from the public streets to accommodate a landing that is within the property line.At the exit gate near the Outdoor Community area, change the gate-swing direction towards Walnut Street. Please use a dotted line or dashed line to demonstrate accessible routes to all entrance of the containers.Dimension the path width near the exit gate at the corner of Walnut Street and Daisy Avenue.The plan shows the following note: “All site work (curbs, ramps, steps, benches, fences, lighting and stage), parking and landscape done in phase 1”. Define phase 2 and specify the phase that is not included on this submittal shall be a separate submittal.Sheet S1.01Please change the name of the jurisdiction to City of Santa Ana under the Deferred Approval Items on sheet S1.01.Second Plan Review Comments: At the bottom right corner of every sheet, there is a statement of:” NOT ISSUED FOR CONSTRUCTION”. Please delete this note.[END]