HomeMy WebLinkAbout288694_1_Corrections.docx
PLAN CHECK NO:
104110786
PROJECT ADDRESS:
1327 N Main St
PLAN CHECK ENGINEER:
So, AnsonTEL:714
647-5830
EMAIL:
aso@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
B, S-1
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
6/14/2022
INITIAL REVIEW
6/24/2022
EXPIRATION
12/11/2022
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
HaciKaraasaan
3.
TEL:
(714)454-4305
FAX:
VALUATION: $75,000.00
EMAIL:
ampleconstruction@gmail.com
FLOOD ZONE: X-0602320163J
APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5830 for an appointment.Sheet A1.0The texts on the aerial photo are upside down. Please fix the texts.The site plan shows six keynotes; however, there are no descriptions on those keynotes.On the site plan, show the north arrow that indicates orientation of the building.What is the New Loading Area on the east side of the building?Provide the following information under Project Data:Floor area of the tenant improvement – Under Legal Description, the total square footage is 3,500. However, the floor plan on sheet A1.0 shows a 4,356 square-foot building.The type of construction - See 2019 California Building Code, Chapter 6 for details.The occupancy groups – The floor plan shows offices, a commercial kitchen room, and a utility room. The use of these spaces do not appear to be an assembly space (A-2) as indicated under Legal Description. Please revise the occupancy groups as Business (B), Factory (F-1), and Storage (S-1).Sprinkler: yes or no?Delete the third paragraph under Project Description and Summary: “All existing conditions are prior work assumed to be compliant…” Provide the following note under Project Data:” The contractor is responsible to retrofit all code violations for all the work done without permits.”The numbers on the Flood Zone appears to be incorrect. Please verify.Under Sheet Index on sheet A0.0, A1.0, and A2.0, please delete the word “existing” and replace it with the word “proposed”. Work-done without permit does not constitute an “existing” condition. The purpose of this plan review and issuance of the building permit document the tenant improvementcompare to the building before the illegal constructions.Under the Keynotes section, note one, two, three, and four are empty. There are total of six keynotes on the site plan.Under Scope of Work, please revise the spelling from “walking cooler” to “walk-in cooler”. Please correct the spelling throughout the construction document.In city of Santa Ana, the Mechanical, Electrical, and Plumbing (MEP) plans are reviewed separately from the architectural and structural plans. Please submit the MEP plans for all work-done without permits.Sheet A1.0Provide a wall legend to show different wall type. The plan shows a wall lines with shaded hatch, unhatched wall lines, and unhatched wall lines with various thickness. Identify the existing wall and proposed wall. Reference the framing detail at the appropriate locations.On the floor-plan room diagram, relabel “Order and Pick Up” with “Commercial Kitchen”.On the floor-plan room diagram, relabel “Utility Room” with “Storage Room”.The floor plan shows four dining tables between the walk-in coolers and the stainless steel worktables. Are the dining tables for the customers or employees? Will there be tenant serving food or drinks in this facility? The equipment floorplan suggests that this is a food-preparation facility, not a restaurant.Enlarge the text size on the keynotes.Keynote #1 indicates separate tenant under this permit. Obtain Planning division’s clearance on separate address and show the separate address or suite number on the plan.Walk-in Cooler and Walk-in Freezer (Plan Check comment #22, 23, 24)Provide structural calculations and plans for the proposed walk-in coolers and walk-in freezer. The panels used must be HCD approved, have a current ICC report, other similar recognized third party approval, or designed by a qualified civil engineer registered with the State of California.Provide the following information for egress requirements: the door size, door net opening width, door opening force, door hardware, door hardware height, door operations, and bolt locks.Door size – specify the width and height of the door. Door net-opening width – specify the clear opening width of the doorway measured between the face of the door and the stop, with the door open 90 degrees.Door opening force – provide the following note on the plan:” The force for pushing or pulling open interior swinging egress doors, other than fire doors, shall not exceed 5 pounds. These forces do not apply to the force required to retract latch bolts or disengage other device that hold the door in a closed position.”Door hardware – specify the type of door hardware. For example -handle, pull, latches and lock.Door hardware height – specify the door hardware height.Door operation – provide the following note on the plan: “Egress doors shall be readily openable from the egress side without the use of key or special knowledge or effort.”Bolt locks – provide the following note on the plan: “Manually operated flush bolts or surface bolts are not permitted.”Specify the thermal resistance, R-value, of the walk-in cooler/freezer’s walls, ceiling, door, and floor.What type of materials are stored in the 856 square-foot “utility room” besides the water heaters and the electrical panel?Sheet A2.0Specify ceiling height.Sheet A6.0Identify existing walls and proposed walls.Provide structural connection detail between sill plate of the wall and the slab-on-grade.Provide structural connection detail between the top of the wall and the ceiling.Show the assembly of the walls and ceiling with the R-value at the walk-in cooler and walk-in freezer.Sheet A7.1Remove all city handouts on sheet A7.1. These handouts are outdated.[END]