Loading...
HomeMy WebLinkAbout287388_3_Corrections.docxPLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101110364 (Garage A), 101110365 (Garage B), 101110443 (Podium A), 101110444 (Podium B) PROJECT ADDRESS: 2010 E Warner Ave Bldg# P, 2350 S Redhill Ave, #P PLAN CHECK ENGINEER: Lee, WayneTEL:714 647-5848 EMAIL: wlee@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: I B, SPK OCCUPANCY CLASSIFICATION(S): A-3, S-2 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 5/11/2022 INITIAL REVIEW 5/18/2022 EXPIRATION 11/7/2022 RECHECKS: 1.06/14/2022 PROJECT APPLICANT CONTACT PERSON: 2. Heidi Hare 3. TEL: (949)246-0492 FAX: VALUATION: EMAIL: heidi@jlhare.com FLOOD ZONE:X-0602320279J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS** No redlines or additional comments marked on the drawings.All drawings and supporting documents shall be prepared, stamped and signed by a California registered civil engineer. CBC Sections A106.1 and A106.3.4.1.The foundation plans of the Geopier design must be approved by the soils engineer who prepares soils report.PC2: Submit (2) copies of approval letter from the geotechnical engineer of the GPI geotechnical professionals INC.PC3: Not provided.Provide an approval letter from the soils engineer in record. The amendment shown on the design memorandum letter provided by WGI must also be approved by GPI Geotechnical professionals Inc (#3069.1, date October 26, 2021), such as:Increase allowable bearing capacity up to 7000 psi.1.5” or less of static settlement.1” or less of combined (static + seismic) differential settlement over a horizontal distance of 60 feet.Removal of grade beams.The effect of geologic and seismic hazards such as liquefaction, soils instability, differential settlement and surface displacement.Please verify if the design groundwater depth of 10 feet is taken into consideration as the Geopier plan shows the depth of the Geopier of 7 feet to 16 feet.PC2: Submit (2) copies of approval letter from the geotechnical engineer of the GPI geotechnical professionals INC.PC3: Not provided.END OF COMMENTS