HomeMy WebLinkAbout275035_7_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101106658
PROJECT ADDRESS:
1610 E First St
PLAN CHECK ENGINEER:
Ahangian, KathyTEL:714
647-5812
EMAIL:
Kahangian@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
A-3
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
5/12/2021
INITIAL REVIEW
5/28/2021
EXPIRATION
11/8/2021
RECHECKS:
1.8/17/215. 5/2/22
PROJECT APPLICANT CONTACT PERSON:
2.10/8/21
Mustafa Bdaiwi
3.1/13/22
TEL:
(714)673-6611
4 3/1/22
FAX:
VALUATION: $15,000.00
EMAIL:
mbarchitect@ymail.com
FLOOD ZONE: X-0602320276J
APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.Please return marked up set of drawings with corrections.The drawings/information submitted for Building Safety Division review is incomplete. The applicant shall, prior to resubmitting, complete all construction documents to show compliance with the 2019 California Building Standards Code with local amendments.CBC Sections A106.1 and A106.3.4.1, All drawings and supporting documents shall be prepared, stamped and signed by a California licensed architect or registered civil engineer.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Fire Department approval on the corrected/final sets of drawings ((714)573-6100)
- Public Works Agency approval (647-5039)
- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceSTRUCTURAL COMMENTS:Provide calculation to design moment frame members (beams and columns) and moment connections.3rdPlan check comments:Please update ETABS Steel OMF calculation and plan (if needed). Refer to calculation page 45 under Design Data:Revise calculation to use importance factor Ie=1.25 (Risk Category III)Revise calculation to use correct seismic parameter for OMF: R=3.5, Omega=3, Cd=3. (ASCE 7-16 Table 12.2-1)Revise Sds=1.027 (this calculation)Provide a complete moment connection design meeting AISC 341 & AISC 358 and detail the moment connection on the plans.3rdPlan check comments:Please provide continuity plate design and detailon plan. Delete the note on the drawing” continuity plates by others”.