HomeMy WebLinkAbout286995_2_Corrections.docxRESIDENTIAL PLAN CHECK
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101110262
PROJECT ADDRESS:
1336 S Birch St
PLAN CHECK ENGINEER:
Lo, JonathanTEL:714
647-5822
EMAIL:
Jlo@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
R-3, U
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
4/28/2022
INITIAL REVIEW
5/8/2022
EXPIRATION
10/25/2022
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Ruben Pena
3.
TEL:
(714)552-5731
FAX:
VALUATION: $40,000.00
EMAIL:
rpena@inkminded.com
FLOOD ZONE: X-0602320276J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2019 California Residential Code (CRC); 2019 California Building Code (CBC); CMC = 2019 California Mechanical Code; CPC = 2019 California Plumbing Code; CEC = 2019 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5822 for an appointment.
5. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
☒Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process.
☒Public Works Agency approval (647-5039).
☐Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700).
☐Police Department approval on the corrected/final set of drawings (647-5840).
☐School District Approval; and a copy of the school fee worksheet, completed by the plan check engineer, shall be required by the School District to verify the scope of the work.
☐Proof of Worker's Compensation Insurance shall be required at the time of permit issuance.
☐Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039).Comments have been provided on drawing and calculation hard copies in relation to all comments below. These may be picked up at Building and Planning department at applicants’ discretion.DrawingsSheet 1 of 13
Provide the following design data on the first sheet (R106.1.1)
☒Occupancy groups (R-3/U)
☐Type of construction (V-B)
☐Automatic Fire Sprinkler (YES or NO)
☐Number of stories.
☒Flood Zone: X
☐Flood Zone: A
☐Flood Zone: AE
☐Floor area per occupancy group, including the existing structure(s)
☐Construction shall comply with the 2019 CRC, CBC, CPC, CMC, CEC, California Green Building Code, and California Energy Efficiency Standards Code editions.Sheet 12 and 13 not provided in set, please provide or revise sheet index.Sheet 2 of 13Provide U-Factor and SHGC in window schedule.Sheet 2a of 13Reference detail 1 and 2 on plans where occurs.Sheet 3 of 13Details and notes are illegible on provided sheet, please clear or enlarge to make legible.Sheet 5 of 13Details and notes are illegible on provided sheet, please clear details and notes in details for clarity.Detail “A” and Detail “B” – coordinate with Detail 5 for wood attachments and dimensions. Revise as needed.Verify detail 4 reference on north wall, provide post installed option as needed. Provide detail for intermediate wall foundation with flooring on both sides. Dowel new access door into existing foundation. Sheet 6 of 13Details and notes are illegible on provided sheet, please clear details and notes in details for clarity.Update code references in notes to current codes.Note on plan: Mechanical, electrical and plumbing are not part of this plan review and approval. MEP are subject to building field inspection.Sheet 7 of 13Details and notes are illegible on provided sheet, please clear details and notes in details for clarity.Show existing CJ on plans.Provide shearwall lengths on plan.Provide framing detail for attic access.Provide detail for interior non-bearing wall connections. Sheet 8 of 13Provide shearwall lengths on plan.Verify/provide drainage for garage roof at west elevation.Detail 2 – Provide (2) #4 bars T&B min. New Garage – For each dwelling unit, install a listed raceway to accommodate a dedicated 208/240-volt branch circuit (40 amp). On the plan, please show compliance with Section 4.106.4.1. Verify KP provided at new garage door Beam. Details referencing sheet 13 not provided. Additional CommentsSheet 7 of 13 – Section A-A: Underside of eave projecting into 5’-0” setback requires 1-hour fire rating underside. Please provide detail. (End of Comment)