Loading...
HomeMy WebLinkAbout287006_2_Corrections.docxSPC PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101110266 PROJECT ADDRESS: 1901 E First St PLAN CHECK ENGINEER: Huang, GaryTEL:714 647-5862 EMAIL: Ghuang@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: N/A OCCUPANCY CLASSIFICATION(S): N/A PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 4/28/2022 INITIAL REVIEW 5/24/2022 EXPIRATION 10/25/2022 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Gerry Encarnacion 3. TEL: (714)241-8944 FAX: VALUATION:$100,000.00 EMAIL: gencarnacion@musserarchitects.com FLOOD ZONE:X-0602320277J GUIDELINES: Comments contained within this report reflect only those of the Building and Safety Division. Additional comments or corrective action may be required by other Departments and/or outside Agencies This Plan Review Report and all subsequent code references are based upon the most recent version(s) of the 2019 California Building Codes (CBC, CRC, CFC, CEC, CPC, CMC, CGBSC, and CEES) The approval of plans and any supporting documents does not permit the violation of any section of the adopted building codes or other pertinent local ordinances, or state and federal laws All listed plan review comments must be adequately addressed before a building permit can be issued Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used. Please see correction on submitted plans. Red marked set must be returned with revised plans. Plans resubmitted without the red markup set may result in delayed review time and additional plan check fees. PLAN REVIEW COMMENTS: Applicant shall address all the checked‘☒’ correction comments below before resubmitting plans to Building Safety for recheck. ☒1. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: ☒Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. ☒Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700). ☒Police Department approval on the corrected/final set of drawings (647-5840). ☒Public Works Agency approval (647-5039). ☐Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. ☐School District Approval; and a copy of the school fee worksheet, completed by the plan check engineer, shall be required by the School District to verify the scope of the work. ☐Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039).☒Additional Review Comment: Sheet A1.00 Detail G4 Specify maximum effort to operate door per CBC 1126A.4 on plan Provide minimum 24” extension past the strike edge for exterior door or gate per CBC 1126A.3.2.1 Provide on plan structural material note (i.e. concrete strength, reinforcing material, soil lateral bearing pressure Provide footing depth required and footing reinforcement. Provide construction detail where required Sheet A1.01 Detail A4 Provide minimum side wall width at new concrete walkway existing the (E) parking structure per CBC 1113A.1 Provide surface cross slope per CBC 1113A.1.1 at side walk and landing respectively at walk way existing the (E) parking structure Provide surface cross slope at the existing walkway at the new gate Detail G16 Provide dimension of (N) concrete walk way Provide surface cross slope 2% at door maneuvering space Provide minimum 24” extension past the strike edge for exterior door or gate per CBC 1126A.3.2.1 Red marked comment set is available to pick-up at the City Hall. (End of Comment)