PLAN CHECK NO:
101109586
PROJECT ADDRESS:
2141 N Spruce St Unit# 2
PLAN CHECK ENGINEER:
Lo, JonathanTEL:714
647-5822
EMAIL:
Jlo@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
R-3, U
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
2/28/2022
INITIAL REVIEW
3/16/2022
EXPIRATION
8/27/2022
RECHECKS:
1.7/11/2022
PROJECT APPLICANT CONTACT PERSON:
2.
Silvia Leon
3.
TEL:
(714)623-3984
FAX:
VALUATION: $50,000.00
EMAIL:
sleon138@yahoo.com
FLOOD ZONE: X-0602320144J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2019 California Residential Code (CRC); 2019 California Building Code (CBC); CMC = 2019 California Mechanical Code; CPC = 2019 California Plumbing Code; CEC = 2019 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5822 for an appointment.
5. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
☒Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process.
☒Public Works Agency approval (647-5039).
☐Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700).
☒Police Department approval on the corrected/final set of drawings (647-5840).
☒School District Approval; and a copy of the school fee worksheet, completed by the plan check engineer, shall be required by the School District to verify the scope of the work.
☐Proof of Worker's Compensation Insurance shall be required at the time of permit issuance.
☐Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039).Comments have been provided on drawing and calculation hard copies in relation to all comments below. These may be picked up at Building and Planning department at applicants’ discretion.DrawingsSheet A-1
Provide the following design data on the first sheet (R106.1.1)
☐Occupancy groups (R-3/U)
☐Type of construction (V-B)
☐Automatic Fire Sprinkler (YES or NO)
☐Number of stories.
☒Flood Zone: X
☐Flood Zone: A
☐Floor area per occupancy group, including the existing structure(s)
☐Construction shall comply with the 2019 CRC, CBC, CPC, CMC, CEC, California Green Building Code, and California Energy Efficiency Standards Code editions.Note on plan: Mechanical, electrical and plumbing are not part of this plan review and approval. MEP are subject to building field inspection.Exterior walls without Automatic Residential Fire Sprinkler – (Table R302.1(1))
Exterior walls located less than 5-ft from a property line shall be of one hour construction.
Exterior walls located less than 3-ft from a property line – No opening shall be provided.
Wall between 3-ft and 5-ft of the property line – 25% of wall openings are permitted.
Eaves projection – Provide one-hour protection on the underside of eave when eaves projected into the 5-ft of fire separation distance. No projection beyond 2-ft of the fire separation distance.
Recheck #1: All fire rated required walls shall have fire rated system on each side (exterior and interior for perimeter walls, both sides of interior walls). Clearly specify system on each side for shared wall and specify system for exterior side of perimeter wall.
Walls separating dwelling units (main house and new ADU) shall be minimum 1-hour fire partition. Fire rated floor-ceiling and wall assemblies shall extend to and be tight against the exterior wall, and wall assemblies shall extend from the foundation to the underside of the roof sheathing. Provide details on the plans. (R302.3 CRC)
Recheck #1: All fire rated required walls shall have fire rated system on each side (exterior and interior for perimeter walls, both sides of interior walls). Clearly specify system on each side for shared wall and specify system for exterior side of perimeter wall.
Walls separating dwelling units shall provide airborne sound insulation for walls with an STC rating of at least 50 per. Provide details on plans and provide verification of a tested assembly to achieve the required STC rating of 50.
Floor/ceiling assemblies separating dwelling units shall have both an STC and an IIC rating of at least 50. Provide details on plans and provide verification of tested assemblies to achieve the required STC and IIC ratings of 50.Add U-Factor and SHGC in window scheduleVerify if windows are new or existing, plans do not match elevations.Sheet A-2Specify Ceiling height on elevations.Verify if windows are new or existing, plans do not match elevations.Sheet S-1All Code References shall reference current code (e.g. Soil Specification)Verify Diamond Number symbol on plan.Dowel (N) SOG into (E) SOG, provide dowel information and detail.Provide new Beam Member size at south end supporting hip beams.Provide detail for (N) hip beam to Beam Member in comment #14.Provide detail for new RR to Beam Member in comment #14.Sheet SDDetail 6 – Provide (N) RR to existing connection.Detail 14 – Epoxy embed shall be from start of new concrete or justify adequate dowels from new footing to existing slab.CalculationsLateral Design & Analysis – Provide iteration of shear line % used for base shear in line.(End of Comment)