Loading...
HomeMy WebLinkAbout290466_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 104111331 PROJECT ADDRESS: 201 S Mountain View St PLAN CHECK ENGINEER: Ahangian, KathyTEL:714 647-5812 EMAIL: Kahangian@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: III B OCCUPANCY CLASSIFICATION(S): B, S-1 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 7/25/2022 INITIAL REVIEW 8/30/2022 EXPIRATION 1/21/2023 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. VacheNayirian 3. TEL: (818)484-6466 FAX: VALUATION: $228,000.00 EMAIL: vnayirian@yahoo.com FLOOD ZONE: A-0602320256J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.Please return marked up set of drawings with corrections.The drawings/information submitted for Building Safety Division review is incomplete. The applicant shall, prior to resubmitting, complete all construction documents to show compliance with the 2016 California Building Standards Code with local amendments.Clearly indicate the scope of work under this building permit application: - Revise project job description on the building permit application worksheet to reflect the work to be done under the subject building permit application.( Including parking restriping) - Construction drawings must clearly show all work to be done under the subject building permit application. (Provide items per permit application) - Delete all notes and details from drawings that are not a part of the work to be done under the subject building permit application. This includes mechanical, plumbing and electrical work that is not specifically required by the Building Code.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings ((714)573-6100) - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039) - School District Compliance Certificate; a copy of the building permit application, signed by the plan check engineer, shall be required by the School District to verify the scope of work. Refer to the attached handout. - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceFor the 2nd floor addition, please see planning before complete plan review.Provide complete structural calculation and structural drawings before complete review.Please note “ Drawings has not been reviewed due to incomplete plans. “ Please note; This project is on Flood zone, provide all FEMA requirements on the drawings.