Loading...
HomeMy WebLinkAbout290477_1_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101111332 PROJECT ADDRESS: 1528 S Standard Ave PLAN CHECK ENGINEER: So, AnsonTEL:714 647-5830 EMAIL: aso@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 7/25/2022 INITIAL REVIEW 7/27/2022 EXPIRATION 1/21/2023 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Jose Gilbert Castillo 3. TEL: (714)713-0339 FAX: VALUATION: $20,000.00 EMAIL: gcastillo@santa-ana.org FLOOD ZONE: X-0602320276J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2019 California Residential Code (CRC); 2019 California Building Code (CBC); CMC = 2019 California Mechanical Code; CPC = 2019 California Plumbing Code; CEC = 2019 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5830 for an appointment. GENERAL REQUIREMENTS Clearances - Please obtain approval from the following agencies prior to permit issuance: Planning Division – After the building division’s approval, request a planner to stamp the plans that building division approves. Public Works Agency (PWA) – After the building division’s approval, obtain a PWA clearance if any of the following apply: project valuation exceeds $30,000, project has added plumbing fixtures, added bedrooms, or project exceeds 500 square foot in new construction. Police Department (PD) – After the building division’s approval, request a PD reviewer to stamp the plans that building division approves. Orange County Fire Authority (OCFA) - Submit plans to OCFA as soon as possible if you answer “Yes” to any part of questions 1 through 10 on the plan submittal criteria. Redline Pickups Instructions - The drawings markups (redlines) are available, but you do not need to pick it up. This Plan Check Comments cover all of the correction items. If you decide to pick up the redlines, it is available at the building-division counters located at the City Hall Ross Annex building.  The business hour is Monday through Thursday and alternative Fridays from 8:00 am to 1:00 pm. See the Holiday and Closed Friday Schedule before you plan your visit.Resubmittal Instructions – Please provide a written response to the Plan Check Comments. Provide two copies of the latest construction document (drawings, calculations, and others related document). Provide one additional copy of drawings for new constructions or additions. Resubmit all construction document with one of the three options below: Resubmittal Bin:Complete the Plan Check Re-Submittal Form along with the resubmittal. The resubmittal bin is available at the City Hall Ross Annex lobby, Monday through Thursday and alternating Fridays from 8:00 am – 4:00pm. See the Holiday and Closed Friday Schedule before you plan your visit. Walk-ins: Daily walk-ins are available for resubmittals at first come first serve basis. Please note all scheduled appointments will be served first prior to any walk-ins. Appointment: Call the Building division at 714-647-5800 to schedule a resubmittal appointment, or contact your assigned permit counter staff for your specific project.Plan Check Expiration – This plan-check will expire after 180 days from the submittal date unless the applicant request for an extension. The extension request must be in writing and demonstrate a justifiable cause. The Building Official is authorize to grant a one-time extension of additional 180 days. If the plan-check expires after December 31, 2022, the new 2022 California Code of Regulations will be in effect; an expired plan designed with the 2019 California Code of Regulations will be no longer acceptable after December 31, 2022. Sheet A-1Under Scope of Project, please indicate the total floor area of the remaining structure after the partial demolition. In addition, include the roof structural alteration as part of work scope.On the permit application, the proposed use of the remaining structure is an electrical storage. Indicate such use on the plan.Provide the following building code data: occupancy group, type of construction, sprinkler (yes or no), height, and floor area.Under Sheet Index, include 3 pages of structural calculations below sheet S-1. Sheet A-3The elevation drawings are not-to-scale. Either revise the scale or print the drawings that match the scale.There appears to be some drawing errors on the floor plan and details. There are broken lines and patches of empty spots. The wall lines are not shown. A door is missing.Label the room “Electrical Storage” on the floor plan. [The End]