PLAN CHECK NO:
101107866
PROJECT ADDRESS:
217 S Gunther St
PLAN CHECK ENGINEER:
Lee, WayneTEL:714
647-5848
EMAIL:
wlee@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
R-3, U
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
9/2/2021
INITIAL REVIEW
10/7/2021
EXPIRATION
3/1/2022
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Devin Thai
3.
TEL:
(949)529-7905
FAX:
VALUATION: $20,000.00
EMAIL:
devinmdthai@gmail.com
FLOOD ZONE: X-0602320256J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2019 California Residential Code (CRC); 2019 California Building Code (CBC); CMC = 2019 California Mechanical Code; CPC = 2019 California Plumbing Code; CEC = 2019 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.
Please see corrections on submitted plans. Red marked set must be returned with revised plans. Plans resubmitted without the red markup set may result in delayed review time and additional plancheck fees.
The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804). Previously
approved plans should be submitted to expedite the process.
Please determine and clarify on sheet A-1 who is the engineer of record of this project.
STRUCTURAL
It appears the engineer of record is changed. Please clarify. If the new engineer is to take over this project, please provide complete vertical and lateral design and calculation of the proposed structure from the new engineer. Submit (2) sets of calculation to verify the design on the structural plans. Please note that new comments may apply after next review. Structural plans and calculation must be stamped, signed and dated from the same engineer of record.
The 2 feet wide shear panel exceed the maximum allowable ratio: bs/h=8/2=4.
Revise structural design and calculation to show compliance with AF&PA SDPWS T4.3.4 for shear wall ratio of 2:1. For design to resist seismic forces, shear wall height-width ratios greater than 2:1, but not exceeding 3½:1, are permitted provided the allowable shear values in T4.3.4 are multiplied by (WSP)=1.25-0.125h/bs. (2015 SDPWS 4.3.4.2)
PC2: The 10% rule under the California Existing Building Code does not apply to the new construction of the patio cover. Please provide complete lateral calculation per 2019 California Building Code.
Update shear schedule to comply with 2019 version of CBC.
PC2: Pending from the first review.Please provide complete lateral calculation per 2019 California Building Code.
END OF COMMENTS