Loading...
HomeMy WebLinkAbout289935_1_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101111151 PROJECT ADDRESS: 2021 N Deodar St PLAN CHECK ENGINEER: Lo, JonathanTEL:714 647-5822 EMAIL: Jlo@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3, U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 8/10/2022 INITIAL REVIEW 9/1/2022 EXPIRATION 2/6/2023 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Silvia Fuentes 3. TEL: (949)556-7233 FAX: VALUATION: $75,000.00 EMAIL: sj.fuentes@hotmail.com FLOOD ZONE: X-0602320164J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2019 California Residential Code (CRC); 2019 California Building Code (CBC); CMC = 2019 California Mechanical Code; CPC = 2019 California Plumbing Code; CEC = 2019 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5822 for an appointment.The drawings/information submitted for Building Safety Division review is incomplete. The applicant shall, prior to resubmitting, complete all construction documents to show compliance with the 2010California Building Standards Code with local amendments and to clearly indicate the scope of work under this building permit application. There may be additional requirements when complete construction drawings and supporting data is submitted for Building Safety Division review. 6. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: ☒Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. ☒Public Works Agency approval (647-5039). ☐Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700). ☒Police Department approval on the corrected/final set of drawings (647-5840). ☒School District Approval; and a copy of the school fee worksheet, completed by the plan check engineer, shall be required by the School District to verify the scope of the work. ☐Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. ☐Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039).Comments have been provided on drawing and calculation hard copies in relation to all comments below. These may be picked up at Building and Planning department at applicants’ discretion.Documentation Many sheets have been cutoff on the side or have illegible print. Please ensure no misprint in resubmittal. Architectural Stamp is not legible on sheets, please correct, typ all sheets.DrawingsSheet C1 Provide the following design data on the first sheet (R106.1.1) ☐Sheet Index ☐Occupancy groups (R-3/U) ☒Type of construction (V-B) ☐Automatic Fire Sprinkler (YES or NO) ☐Number of stories. ☒Flood Zone: X ☐Flood Zone: A ☐Flood Zone: AE ☐Floor area per occupancy group, including the existing structure(s) ☐Construction shall comply with the 2019 CRC, CBC, CPC, CMC, CEC, California Green Building Code, and California Energy Efficiency Standards Code editions.Notes are cut off in misprint. Please fix.Add sheet A-2 and any new or removed sheets from List of Drawings.Underside of eave projecting within 5’-0” from property line require 1-hour fire rated system. Specify on plan where required and provide detail. Sheet print has been cutoff at bottom, please fix.Provide scale for site and roof plan.New sliding door in living area addition requires alarm notifying residents when opened due to accessibility to pool. New alarm must be noted on plan.Roof plan note not legible, please enlarge or remove.Note on plan: Mechanical, electrical and plumbing are not part of this plan review and approval. MEP are subject to building field inspection.Sheet A1Clearly indicate on floor plan the location of existing walls, new walls, and walls to be removed. Walls do not match provided Wall Legend.Provide ICC # for new roof, match existing does not suffice.Sheet A2Drawing print issue on right side, please fix.Provide material notes for all new materials (wood, concrete, rebar, etc…)Show existing roof framing being supported by new beams.Verify vaulted ceiling noted on plan with all details, details show ceiling joists and rafter ties, details shall be revised to adequately show intended connections and framing. If rafter ties are to be provided, provide height of connection. Provide calculations for gravity and lateral system, prescriptive design is not acceptable for vaulted ceiling framing and lateral system provided. New ridge board shall be designed as a beam with support at ends. Provide adequate load path.Details 1,2, 3 – Slab on grade called out does not match foundation plan. Revise to match. Sheet CF1Prescriptive sheet shall be removed, see comment #18.(End of Comment)