Loading...
HomeMy WebLinkAbout290759_1_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 102111423 PROJECT ADDRESS: 1109 W Twenty-First St PLAN CHECK ENGINEER: Lo, JonathanTEL:714 647-5822 EMAIL: Jlo@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3, U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 8/12/2022 INITIAL REVIEW 9/6/2022 EXPIRATION 2/8/2023 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Jenny Warkenton 3. TEL: (949)378-1169 FAX: VALUATION: $28,000.00 EMAIL: jwarkenton@gmail,.com FLOOD ZONE: X-0602320144J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2019 California Residential Code (CRC); 2019 California Building Code (CBC); CMC = 2019 California Mechanical Code; CPC = 2019 California Plumbing Code; CEC = 2019 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5822 for an appointment. 5. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: ☒Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. ☒Public Works Agency approval (647-5039). ☐Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700). ☐Police Department approval on the corrected/final set of drawings (647-5840). ☐School District Approval; and a copy of the school fee worksheet, completed by the plan check engineer, shall be required by the School District to verify the scope of the work. ☐Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. ☐Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039).Comments have been provided on drawing and calculation hard copies in relation to all comments below. These may be picked up at Building and Planning department at applicants’ discretion.DocumentationDrawing set shall be provided with a title sheet with the following information provided:Complete legal description.Index of drawings.The address of the building, and the name and address of the owner(s) and person(s) preparing the plans are required on the first sheet of the plans.Include address and telephone number of the responsible designer and date of signing of drawings. Provide building information on plans: - Occupancy type: R3 / U - Construction type: Type V – B - Fire sprinklered: Yes / No - Fire sprinkler type: (where applicable)Provide complete project description with detailed description of scope of work.Provide a statement on the title sheet of the plans that this project shall comply with following codes:- 2019 California Residential Code (CRC)- 2019 California Building Code (CBC)- 2019 California Electrical Code (CEC)- 2019 California Mechanical Code (CMC)- 2019 California Plumbing Code (CPC)- 2019 California Green Building Standards Code (CGBS) or CALGreen- 2019 California Energy Code (CEnC)- City of Santa Ana Municipal CodeEach submitted sheet shall be labeled.DrawingsSheet 1Scope of work provided specifies FAU to be relocated to attic. Provide detail or note specifying the following. For an FAU located in the attic, provide a minimum access of 22 x 30 inches, a 24-inch wide walkway, a 30-inch deep work platform, and electric light outlet adjacent to the furnace and switched by the opening. (CMC 904.11 & 305)Scope of work provided specifies new doors in garage and at entry way. All new doors and windows shall be provided in plans.(End of Comment)