HomeMy WebLinkAbout283509_3_Corrections.docxSPC
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101109238
PROJECT ADDRESS:
1353 N Santiago St
PLAN CHECK ENGINEER:
Lee, WayneTEL:714
647-5848
EMAIL:
wlee@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
III B
OCCUPANCY CLASSIFICATION(S):
S-2
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
1/26/2022
INITIAL REVIEW
2/4/2022
EXPIRATION
7/25/2022
RECHECKS:
1.06/22/2022
PROJECT APPLICANT CONTACT PERSON:
2.09/02/2022
Frank Wright
3.
TEL:
(310)750-8939
FAX:
VALUATION:$40,000.00
EMAIL:
fwright082@gmail.com
FLOOD ZONE:X-0602320163J
APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTSARCHITECTURALSheet A-001. Revise sheet index to show correct structural drawings’ information.Provide missing sheet A-405 as indicated in the sheet index.Please provide egress plan:Show total occupant load of the building.Show maximum travel distance on plan, measured from the most remote point within a story to the entrance to an exit along the natural and unobstructed path of egress travel (right-angle method), shall not exceed the distances given in Table 1017.2 and common path of travel.Show maximum common path of travel.Show maximum travel distance.Delete illuminated signs from sheet A-501 (see redmarks) which are not located at the exit doors.Provide exterior door landing on plan with dimensions. Show design method to comply with accessibility and not to be encroached by park cars and landscape.Note the following on the plans: “The means of egress, including the exit discharge, will be illuminated to a level of not less than one foot-candle at the walking surface at all times the building space served by the means of egress is occupied”.Note on the plans: “Exit signs shall be internally or externally illuminated at all times. Externally illuminated exit signs shall be connected to an emergency power system (batteries, unit equipment or an on-site generator) that will automatically illuminate the exit signs for a duration of not less than 90 minutes in case of primary power loss.”Sheet A-401. Provide accessible curb ramp design at the edge of sidewalk and pedestrian crossing.Sheet A-401. Delete detectable warning which located on the sidewalk.
Refer to plan check #101109232 for balance of corrections.
STRUCTURALRefer to plan check #101109232 for balance of corrections.Update structural drawing number on the drawing title to match structural sheet index on sheet S-0.10.END OF COMMENTS