HomeMy WebLinkAbout285828_3_Corrections.docxRESIDENTIAL PLAN CHECK
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101109892
PROJECT ADDRESS:
3511 W Sunflower Ave
PLAN CHECK ENGINEER:
Lo, JonathanTEL:714
647-5822
EMAIL:
Jlo@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
II B
OCCUPANCY CLASSIFICATION(S):
B
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
3/24/2022
INITIAL REVIEW
4/17/2022
EXPIRATION
9/20/2022
RECHECKS:
1.7/14/2022
PROJECT APPLICANT CONTACT PERSON:
2.
Damian Catalan
3.
TEL:
(626)433-3898
FAX:
VALUATION: $10,000.00
EMAIL:
damian@dcexpediting.com
FLOOD ZONE: X-0602320258J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2019 California Residential Code (CRC); 2019 California Building Code (CBC); CMC = 2019 California Mechanical Code; CPC = 2019 California Plumbing Code; CEC = 2019 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5822 for an appointment.
5. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
☒Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process.
☐Public Works Agency approval (647-5039).
☐Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700).
☐Police Department approval on the corrected/final set of drawings (647-5840).
☐School District Approval; and a copy of the school fee worksheet, completed by the plan check engineer, shall be required by the School District to verify the scope of the work.
☐Proof of Worker's Compensation Insurance shall be required at the time of permit issuance.
☐Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039).Comments have been provided on drawing and calculation hard copies in relation to all comments below. These may be picked up at Building and Planning department at applicants’ discretion.DrawingsSheet FD1Foundation Plan and Details shall be stamped and signed by licensed Civil engineer or Architect.Provide necessary temporary generator design, location, dimensions, and weight.Recheck #1: Provide temp generator permit number on set as deferred permit. Verify Seismic Design provided including Sds value.Provide expansion bolt design and ICC for Concrete Wedge Anchor Details.Sheet A014Please provide access path to trailers.Please verify if any intended public use will be required for temporary trailers. Provide accessible ramp to trailers complying with 2019 CBC Chapter 11B. Recheck #1: Please specify on drawing set intended use of temporary trailers for construction purpose only. Please provide stair/ramp details to temporary trailers.Trailers shall not block any existing accessible parking or temporary additional accessible parking required.Additional CommentsProvide State of California Housing Registration Card in either structural or architectural set. (End of Comment)