HomeMy WebLinkAbout291596_2_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101111634
PROJECT ADDRESS:
219 E Fourth St
PLAN CHECK ENGINEER:
Le, TungTEL:714
647-5896
EMAIL:
Tle10@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B, SPK
OCCUPANCY CLASSIFICATION(S):
B, M
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
8/16/2022
INITIAL REVIEW
8/23/2022
EXPIRATION
2/12/2023
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Jeff Beddow
3.
TEL:
(949)722-7400
FAX:
(949)722-8855
VALUATION: $35,000.00
EMAIL:
jeff.saproperties@gmail.com
FLOOD ZONE: X-0602320276J
APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Police Department approval on the corrected/final set of drawings (647-5840)
- Public Works Agency approval (647-5039)
- County of Orange Health Department approval on the corrected/final set of drawings (714)433-6000Sheet T1: Building Data: Occupancy Use: Please include the Retail as part of the use of the building. Occupancy Group: Please include the occupancy group ‘B’ for the coffee area. Scope of work: Please revise scope of work to clarify as following – Proposed a coffee shop within the existing retail space and add two new accessible restrooms. Sheet A0.1: Security Grill: Please note on plan, the security grill remain open during the retail space is occupied. On the plan, please show maneuver space complying with section 11B-404.2.4 on both sides of doors. Show dimensions on plan. Provide door threshold details and clearly cross-reference onto the plan. Customer service counter elevation referenced to 3/A4 was not applicable. Please coordinate and revise reference accordingly. Single user restroom should be identified as “All-Gender”Wall detail: Please specify size of metal stud and provide ICC report number for the metal wall studs. Wall detail: Please specify ICC report number for the Hilti anchor. Door schedule note 5: Please reference to sheet A5 for door schedule. Please provide detail for the retail cashier counter. Counter must be accessible for the persons with disabilities. Sheet A2: Restroom Floor plan: Please show restroom door not encroach more than 12” into the turning circle. Single user restroom should be identified as “All-Gender”. And shall provide with the follow door symbol. No pictogram, text, or braille is required on the symbolSheet A4: Please cross-reference building section on the plan so that it can be easily located. Door note #5: Please revise note as following “THIS DOOR TO REMAIN UNLOCKED WHEN THIS SPACE IS OCCUPIED.”On the plan, please provide door schedule for the existing doors. Existing doors shall be made accessible to the persons with disabilities per current code. Final plans shall be signed and dated by the designer. Apply to all sheets. (End of Comment)