HomeMy WebLinkAbout290763_2_Corrections.docxRESIDENTIAL PLAN CHECK
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101111425
PROJECT ADDRESS:
728 N Poinsettia St
PLAN CHECK ENGINEER:
So, AnsonTEL:714
647-5830
EMAIL:
aso@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
B
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
7/28/2022
INITIAL REVIEW
8/7/2022
EXPIRATION
1/24/2023
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Luis Soto
3.
TEL:
(858)437-4247
FAX:
VALUATION:
EMAIL:
luis@lsrbuilders.com
FLOOD ZONE: X-0602320163J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2019 California Residential Code (CRC); 2019 California Building Code (CBC); CMC = 2019 California Mechanical Code; CPC = 2019 California Plumbing Code; CEC = 2019 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5830 for an appointment.
GENERAL REQUIREMENTS
Clearances - Please obtain approval from the following agencies prior to permit issuance:
Planning Division – After the building division’s approval, request a planner to stamp the plans that building division approves.
Public Works Agency (PWA) – After the building division’s approval, obtain a PWA clearance if any of the following apply: project valuation exceeds $30,000, project has added plumbing fixtures, added bedrooms, or project exceeds 500 square foot in new construction (not renovation).
Police Department (PD) – After the building division’s approval, request a PD reviewer to stamp the plans that building division approves.
Orange County Fire Authority (OCFA) - Submit plans to OCFA as soon as possible if you answer “Yes” to any part of questions 1 through 10 on the plan submittal criteria.
School District
Orange County Health Department (OC Health)Redline Pickups Instructions - The drawings markups (redlines) are available, but pickup is not required. This Plan Check Comments cover all of the correction items. If you decide to pick up the redlines, it is available at the building-division counters located at the City Hall Ross Annex building. The business hour is Monday through Thursday and alternative Fridays from 8:00 am to 1:00 pm. See the Holiday and Closed Friday Schedule before you plan your visit.Resubmittal Instructions – Please provide a written response to the Plan Check Comments. Provide two copies of the latest construction document (drawings, calculations, and others related document). Provide one additional copy of drawings for new constructions or additions. Resubmit all construction document with one of the three options below:
Resubmittal Bin:Complete the Plan Check Re-Submittal Form along with the resubmittal. The resubmittal bin is available at the City Hall Ross Annex lobby, Monday through Thursday and alternating Fridays from 8:00 am – 4:00pm. See the Holiday and Closed Friday Schedule before you plan your visit.
Walk-ins: Daily walk-ins are available for resubmittals at first come first serve basis. Please note all scheduled appointments will be served first prior to any walk-ins.
Appointment: Call the Building division at 714-647-5800 to schedule a resubmittal appointment, or contact your assigned permit counter staff for your specific project.Plan Check Expiration – This plan-check will expire after 180 days from the submittal date unless the applicant request for an extension. The extension request must be in writing and demonstrate a justifiable cause. The Building Official is authorize to grant a one-time extension of additional 180 days. If the plan-check expires after December 31, 2022, the new 2022 California Code of Regulations will be in effect; an expired plan designed with the 2019 California Code of Regulations will be no longer acceptable after December 31, 2022.I have reviewed the changes on sheet S-1. It appears all the grade-beam design have been removed, which was a major structural issue prior to the previous approval. Please provide a narrative on why the grade-beam design is removed. For the pad footing design, an over-strength factor per ASCE7-16 section 12.2.5.2 must be considered in the lateral load resistant design. Revise structural calculations page 11 to 19 as needed. In addition, verify the steel column’s required-axial strength not to exceed 15% of available strength per the code requirement. Due to the restrictive requirement of ASCE7-16 section 12.2.5.2, the as-built columns and footing design are most likely to be under design and the grade beam design should be reconsidered. Shall you decideto reuse the grade-beam design again, consider the over-strength factor per ASCE7-16 section 12.2.5.2 at the worst location with the applicable load from the cantilever columns. In addition, verify the development length adequacy per ACI 318 Chapter 25.
[The End]