Loading...
HomeMy WebLinkAbout292279_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101111863 Revision PROJECT ADDRESS: 3535 W Garry Ave PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: III B, SPK OCCUPANCY CLASSIFICATION(S): B, F-1, S-1 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 8/31/2022 Revision to PC# 101107492 INITIAL REVIEW 9/9/2022 EXPIRATION 2/27/2023 RECHECKS: 1.10/26/22 PROJECT APPLICANT CONTACT PERSON: 2. Brad Kenson 3. TEL: (949)228-5687 FAX: VALUATION: EMAIL: brad@rootsproperties.com FLOOD ZONE: X-0602320258J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings ((714)573-6100) - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039) - Orange County Sanitation District (714) 593-5756Reminder:Please obtain approval from the required agencies above for the changes of the plan. Reminder: Please submit revised plans to OCFA for review and approval. Reminder: Revision submittal for MEP has not been submitted. Due to the architectural changes, Please provide mechanical, Electrical, and Plumbing plans for the changes. MEP shall be provided under separate submittal for separate review and approval. Structural Review Comment: Provide structural plans and details, and calculation for the changes. New openings in existing walls. Sheet S2.0 & S2.1: Please provide structural calculation and details for the new wall openings (at gridline A, between line 7 and 8). Sheet S1.4: Please detail callout for concrete lintel. (End of Comment)